Laserfiche WebLink
surrounding the pipes and structures. Prior to the issuance of a <br />® construction permit, the County shall also require the Corporation's <br />Project engineer to certify that the material to be used will'meet <br />- the standards as set forth in said "Construction Specifications" <br />of the City of Vero Beach, {Vater and Sewer Department, adopted <br />November 1, 1977, or as amended. Upon approval by the'County of the <br />plants and systems and upon payment of a fee of $20.00 per unit; a <br />permit shall be issued to the Bent Pine Utility Company for the <br />construction thereof. The right is hereby reserved to the County <br />to adopt, in addition to the provisions herein contained and existing <br />applicable resolutions or laws, such additional regulations as it shall <br />find necessary in the exercise of the police power and lawful authority <br />vested in said County, provided that such regulations shall be reason- <br />able and not conflict with the rights herein granted and not in conflict <br />with the laws of the State of Florida. The County shall have the right <br />to supervise all construction or installation work performed and to <br />make such inspections as it shall find necessary to insure compliance <br />with all governing regulations. <br />Upon the completion of all construction of the water and sewage <br />treatment plants and distribution and collection systems, the project <br />engineer for the Corporation shall certify, under seal, that the systems <br />have been constructed in accordance with the plans and specifications <br />previously approved, and further, has met all of the standards required <br />by the Conunty, including pressure and leakage tests and chlorination <br />and bacteriological tests for the water distribution system, and <br />conducting infiltration and exfiltration tests of the sewerage system <br />at Grantee's expense, whereupon the County will issue a permit accepting <br />the water and sewerage systems, and further, that the said water and <br />sewerage systems and all easements, (excepting only the water and <br />sewer plants, and wells without appurtenances, and the real property <br />upon which it is situated), shall he conveyed, along with "as -built" <br />plans, to the County at the time of acceptance by a customary means of <br />conveyance. Corporation shall, in addition, grant necessary easements <br />to County without charge to connect the water and/or sewerage systems <br />to County's Master Water and/or Sewerage Systems and such easements as <br />-A - <br />