My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-147
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 10:55:25 AM
Creation date
8/30/2022 10:51:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2022
Control Number
2022-147
Agenda Item Number
8.W.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order Number 52 for 43rd Avenue Pedestrian & Bicycle
Improvements Project from 12th Street to 18th Street
Project Number
IRC-1818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 52 <br />431d Avenue Pedestrian & <br />Bicycle Improvement Project <br />1. Establishment of a project wide Horizontal Control Network within the PROJECT LIMITS. <br />A Design Survey Baseline will be established and monumented. A minimum of three <br />Design Survey Baseline monuments will be installed. <br />2. Establishment of a project wide Vertical Control Network within the PROJECT LIMITS. All <br />elevations will be referenced to NAVD 1988 datum. <br />The limits of the topographic design survey are as follows: <br />43rd Avenue - between 12th Street and 18th Street, approximately 4,000 linear feet. <br />Topographic survey shall extend no less than 15 feet beyond the right-of- <br />way. <br />B. Geotechnical Investigation: <br />The Consultant will retain the services of a Geotechnical sub -consultant to assist in <br />evaluating the existing soil and roadway pavement conditions. The Geotechnical sub - <br />consultant will provide the following Geotechnical Services: <br />1. Field Exploration Program <br />• Six (6) pavement cores along the shoulder alternating sides <br />• Ten (10) 6 -feet deep hand augers alternating side of the roadway <br />2. Engineering Analysis and Report <br />The Geotechnical Sub -Consultant Engineer shall perform analysis of all the data obtained to <br />evaluate subsurface conditions and develop engineering recommendations to guide site <br />preparation procedures and foundation support. <br />C. Construction Documents: <br />The Construction plan set shall consist of the following: <br />Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.