My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-147
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 10:55:25 AM
Creation date
8/30/2022 10:51:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2022
Control Number
2022-147
Agenda Item Number
8.W.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order Number 52 for 43rd Avenue Pedestrian & Bicycle
Improvements Project from 12th Street to 18th Street
Project Number
IRC-1818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 52 <br />43rd Avenue Pedestrian & <br />Bicycle Improvement Project <br />PHASE SUBMITTALS <br />60% <br />75% <br />100% <br />Cover Sheet (Location map, Project <br />C <br />F <br />F <br />Length, Engineer of Record) <br />General Notes <br />C <br />C <br />F <br />Summary of Pay Items/Quantities <br />P <br />C <br />F <br />Horizontal and Vertical Control Sheets <br />C <br />(Benchmarks, Reference Points, Section <br />C <br />F <br />Corners) <br />Details <br />P <br />C <br />F <br />Plan Sheets (40 scale) <br />C <br />C <br />F <br />Cross Sections at approximately 100 ft <br />C <br />intervals, extending 10'beyond proposed <br />C <br />F <br />right-of-way (1"=5' Vertically, <br />1"=20'Horizontally) <br />Signage & Pavement Marking Plans <br />C <br />F <br />(40 scale) Included in Plan Sheets <br />P <br />Construction Cost Estimate and <br />C <br />C <br />F <br />Quantities <br />Notes: P — Preliminary, C — Complete, but subject to change, F - Final <br />General Construction Plan Requirements: <br />2. Plans shall be prepared on 11" x 17" sheets. <br />3. Each phase submittal shall include drawings in PDF format. <br />4. Plan sheets shall depict existing right-of-way, section lines, property lines, and <br />centerline of construction. Horizontal control points with state plane <br />coordinates for all PC's, PT's, curve radius, curve length and horizontal PIs shall <br />be included on the Plan or summarized in an alignment table. <br />5. Plans shall include spot grades adequate to describe any proposed grading. Spot <br />grades will be provided to delineate ADA regulation compliance. <br />6. Match lines shall not be located within the limits of an intersection. <br />7. All quantities shall reference FDOT Pay Item Numbers. <br />8. All details shall reference FDOT Index Numbers. <br />9. All specifications shall reference to FDOT Specifications for Road and Bridge <br />Construction. Any deviations are special specifications not included in FDOT <br />Specifications are required in the Technical Specifications. <br />10. Initial (30% completion), preliminary (60% completion), interim (90% <br />Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.