My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-149
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 11:15:44 AM
Creation date
8/30/2022 11:14:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2022
Control Number
2022-149
Agenda Item Number
8.Y.
Entity Name
Atkins, North America, Inc.
Subject
CCNA2018 Work Order 7 for Conceptual design of Stormwater Pond/Treatment Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />The report shall include, but not be limited to, the following report section topics: <br />• Executive Summary <br />• Project Goal <br />• Permitting Approach <br />• Data Collection <br />• Design Criteria <br />• Stormwater Model Development <br />• Model Results <br />• Conclusions <br />• Meeting Minutes <br />• Supporting documents <br />Task 8: Construction Plans <br />Phase 1 of the project will include a 30% set of plans. Only select sheets below will be <br />included in the set to convey the concept. The following sheets are anticipated to be included <br />at a preliminary level: <br />1. Key Sheet, General Notes, Summaries of Quantities and Pay Items — Cover <br />page detailing project locations, EOR, County PM, governing standards, specs, <br />and index. General and pay item notes, summaries of pay items and quantities. <br />2. Drainage Map — Plan view showing drainage basins, flow arrows showing <br />drainage patterns, and proposed drainage structure labels. <br />3. Plan Sheet - Location and descriptions of existing conditions and proposed <br />improvements in plan view. Includes typical section of the pond and conceptual <br />locations for the pump station and outfall structure. <br />4. Drainage Details — Detail of pond outfall structure <br />Task 9: Cost Estimate <br />ATKINS shall prepare a preliminary estimate of construction cost. <br />Task 10: Pre -Application Meetings with SJRWMD, FDEP, and IRFWCD <br />ATKINS shall schedule and attend separate pre -application meetings with the SJRWMD, <br />FDEP and IRFWCD to present the project and receive feedback as to the permits required, <br />and feasibility of obtaining water quality credits that can be banked and used by the County <br />in other areas of the watershed. ATKINS will coordinate with County staff on dates and times <br />of the meeting if their attendance is desired. Includes time for meeting preparation and <br />meeting minute completion. <br />IRC_8th_StreetParcel_Scope_ATKI NS.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.