My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-149
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 11:15:44 AM
Creation date
8/30/2022 11:14:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2022
Control Number
2022-149
Agenda Item Number
8.Y.
Entity Name
Atkins, North America, Inc.
Subject
CCNA2018 Work Order 7 for Conceptual design of Stormwater Pond/Treatment Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />Task 11: Meetings <br />ATKINS shall attend meetings to monitor progress and gather input concerning project <br />issues and design solutions. Five (5) progress meetings are included and shall be attended <br />by the Project Manager and lead designer. The meetings will be held virtually. <br />Task 12: Project Management <br />This task includes project oversight and general administration. <br />Task 13: Quality Control <br />This task includes quality control and assurance review of the project deliverables. All <br />documents will be reviewed and accepted by the project quality manager before submittal. <br />B. PHASE 1 Submittals/Deliverables <br />All submittals shall be made via PDF. <br />1. Task 1: Data Collection Technical Memorandum <br />2. Task 7: Drainage Design Documentation Report <br />3. Task 8: 30% Construction Plans and Cost Estimate <br />4. Task 9: 30% Cost Estimate <br />5. Meeting minutes <br />C. PHASE 1 Schedule <br />Work under this task order is expected to commence at NTP and is expected to be completed <br />within approximately 4-6 months. A detailed schedule will be developed following NTP. <br />D. Fees <br />The estimated staff hours and fees required to perform the services described above are <br />included as Exhibit B. Fees shall be based on a lump sum basis except for those items <br />specifically indicated as not -to -exceed. <br />E. Other <br />County Requirements <br />The County will Provide: <br />• Access to the property <br />• Any legal descriptions, boundary survey, or land survey associated with the property <br />that the County has already completed <br />IRC_8th_StreetParcel_Scope_ATKINS.docx 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.