Laserfiche WebLink
40 <br />i <br />I <br />jresults of our engineering evaluation and recommended sewer <br />facilities. The proposed project service area contains in <br />I <br />excess of 4800 acres. The proposed sewage collection, <br />conveyance and treatment facilities will generally consist of <br />five (5) new pumping stations, four (4) retro -fitted pumping <br />stations, over (84,000) feet of force mains sized from 6" to <br />24" in diameter, approximately (10,500) feet of gravity <br />collection sewer, and a 1.0 MGD tertiary wastewater treatment <br />plant with highly treated effluent disposal by means of spray <br />irrigation of the County's Sandridge Golf Course. The total <br />estimated project cost for the proposed project is <br />$7,000,000.00 which includes (50) acres of land for the <br />initial 1.0 MGD treatment plant and future plant expansions. <br />Our office has prepared a separate "Property Assessment <br />Roll" Report and Exhibits which covers the revenue side of <br />this project. Project funding will be based on property <br />assessments derived from Letters of Commitment for equivalent <br />residential units (ERU's). The amount of each assessment <br />will be calculated by multiplying each ERU by 91,250.00. ERU <br />commitments are still being received by our office. As of <br />April 23, 1987, a total of 7,426 ERU's have been committed to <br />this project which represents 89,282,500.00 in funds to <br />construct this project. <br />-28- <br />