Laserfiche WebLink
Page 5 of 5 <br />certifications will not be required by FDOT but the Contractor will still need to follow the <br />standards set forth by the County. James Ennis added that quality control is important <br />especially because this is a heavily used road. He has also requested the Indian River <br />County Sheriff's Department to perform speed limit enforcement. If the successful bidder <br />requires additional traffic and safety enforcement during construction, the County will <br />make the request to the Sheriff's Department. <br />Meeting adjourned. <br />ATTACHED: Sign in sheet <br />\\fileserver2.admin.com\public\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to <br />53rd St Resurfacing (SCOP)\i-Admin\Meetings\PreBid\IRC-1707_PREBID_MIN_20220505.docx <br />