Laserfiche WebLink
Page 4 of 5 <br />with Indian River Boulevard (IRC -1910: 37th Street at Indian River Boulevard) and the <br />Contractor for this project (IRC -1707) may need to coordinate with the Contractor for IRC - <br />1910. Project IRC -1707 will be completed before IRC -1910 is under construction and that <br />project is designed to meet and tie into the pavement of IRC -1707. <br />• James Ennis stated that the City of Vero Beach has applied to the County for a Right -of - <br />Way permit for a stormwater force main that will be on 41St Street, west of Indian River <br />Boulevard where it will then cross under Indian River Boulevard, go to the east and <br />continue to the north to 45th Street. It is expected their project will be permitted and <br />constructed after this project is complete. Some coordination may be needed with the <br />City, but if required, they are expected to work around this project. <br />• James Ennis stated that an addendum will be issued clarifying the question regarding Base <br />Group 6 and Base Group 11. The difficulty in quantifying the pay item was because the <br />widening is minor and mostly related to harmonizing back into the existing grade. <br />• James Ennis clarified that the embankment work was billed as a lump sum pay -time to <br />harmonize the shoulder to 6:1 and 4:1 slope, respectively in the widening areas. It was <br />meant to tie the shoulders back to the existing grades. <br />• James Ennis stated that the pay item for adjusting valve boxes, the current pavement <br />surface doesn't reflect existing valves. A field review of the pavement showed the patch <br />in the pavement that was believed to be a valve box that was paved over at 45th street. <br />Upon further investigation it was determined that this was a patch for an old stop sign that <br />was removed. In the event that there are any valve boxes that have been paved over, the <br />pay item sets a unit price for that work if it's needed. <br />• James Ennis stated that the Contractors are to bid the project as it will be constructed <br />within the project time. If there are long lead times for fiber and conduit, the County will <br />look into delaying the Notice to Proceed or extending the contract time. The <br />determination will be based on the successful bidder's documentation as to when <br />materials can be delivered. This documentation should originate from the suppliers. <br />• James Ennis stated that weather days will be done on a monthly basis and must meet FDOT <br />concurrence. <br />• James Ennis stated that the Force Account is strictly for items that are unanticipated and <br />additional to the work. It is not paid out unless there is additional work issued and <br />approved by the County. <br />• The AutoCAD drawing file(s) will be sent as part of the addendum. <br />• Clarification was given regarding the pay item for "Grate for Existing Drainage Structure, <br />Furnish and Install", the item is specified in SF (square feet) due to the fact that the existing <br />drainage structures in need of new grates are not within FDOT dimensional standards and <br />will need to be custom made to fit each structure. The inlet grates are to be reticuline <br />steel, require H-20 loading and be hot dipped galvanized. <br />• Jennifer Hyde (Indian River County Purchasing) stated this project is a unit price bid and <br />every item with a unit price space must be filled in or the bid will be disqualified. <br />• ChloAnn Lawrence (FDOT Treasure Coast Operations) stated this is a grant project partially <br />funded through the state, FDOT is a silent partner and this is a County project. The <br />Contractor will receive payment from the County and the County will receive <br />reimbursement from FDOT. They will inspect the project to insure it meets the <br />requirements set forth by the County and any communication concerning discrepancies <br />will be between FDOT and the County. This project is not federally funded and material <br />\\fileserver2.admin.com\public\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to <br />53rd St Resurfacing (SCOP)\1-Admin\Meetings\Pre Bid\IRC-1707_PREBID_MIN_20220505.docx <br />