IRC -1707 <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or <br />suitable materials or equipment, or fails to comply with permit requirements, or fails to <br />comply with the technical specifications, or fails to perform the Work in such a way that <br />the completed Work will conform to the Contract Documents, OWNER may order CON- <br />TRACTOR to stop the Work, or any portion thereof, until the cause for such order has been <br />eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty <br />on the part of OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee <br />or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the following sentence <br />in its place <br />A. If within one year after the date of Final Completion or such longer period of time as may <br />be prescribed by Laws or Regulations or by the terms of any applicable special guarantee <br />required by the Contract Documents or by any specific provision of the Contract <br />Documents, any Work is found to be defective, or if the repair of any damages to the land <br />or areas made available for CONTRACTOR's use by OWNER or permitted by Laws and <br />Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR <br />shall promptly, without cost to OWNER and in accordance with OWNER's written <br />instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if <br />the defective Work has been rejected by OWNER, remove it from the Project and replace it <br />with Work that is not defective, and (iii) satisfactorily correct or repair or remove and <br />replace any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.E in its entirety and insert the following sentence in its place <br />B. In special circumstances where a particular item of equipment is placed in continuous <br />service before Final Completion of all the Work, the correction period for that item may <br />start to run from an earlier date if so provided in the Specifications or by Written <br />Amendment. <br />SC -14.02 Progress Payments <br />SC -14.02.6.5. Delete paragraph GC -14.02. B.5. din its entirety and insert the following paragraph in its place: <br />ENGINEER has actual knowledge of the occurrence of any of the events enumerated in <br />paragraph 15.02.A; or <br />SC -14.02.6.5. Add the following sentences at the end of paragraph GC -14.02.B.5: <br />e. OWNER has been required to pay ENGINEER additional compensation because of <br />CONTRACTOR delays or rejection of defective Work; or <br />OWNER has been required to pay an independent testing laboratory for subsequent <br />inspections, tests, or approvals taken after initial failing inspections, tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.0.1 in its entirety and insert the following <br />paragraph in its place: <br />Supplementary Conditions - 00800-8 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 0 3 Section 800 IRC-1707.docx <br />