My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1707 <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the Local Government <br />Prompt Payment Act. F.S. 218.70 et. seq. <br />SC -14.04 Substantial Completion <br />SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Conditions, delete the <br />remainder of paragraph 14.04A in its entirety and replace with the following: <br />"If Engineer considers the Work substantially complete, Engineer will prepare and deliver <br />to Owner a tentative certificate of Substantial Completion that shall fix the date of <br />Substantial Completion. In accordance with the provisions of Florida Statutes section <br />208.735(7)(a)(2005), upon receipt of the tentative certificate of Substantial Completion <br />from Engineer, the Owner, the Engineer, and the Contractor shall conduct a walk-through <br />inspection of the Project to document a list of any items required to render the Work on <br />the Project complete, satisfactory, and acceptable under this Agreement (herein the <br />"Statutory List"). The Statutory List shall be reduced to writing and circulated among the <br />Owner, the Engineer, and the Contractor by the Owner or the Engineer within 30 calendar <br />days after substantial completion. The Owner and Contractor acknowledge and agree <br />that: 1) the failure to include any corrective work, or pending items that are not yet <br />completed, on the Statutory List does not alter the responsibility of the Contractor to <br />complete all of the Work under this Agreement; 2) upon completion of all items on the <br />Statutory List, the Contractor may submit a pay request for all remaining retainage except <br />as otherwise set forth in this Agreement; and 3) any and all items that require correction <br />under this Agreement and that are identified after the preparation of the Statutory List <br />remain the obligation of the Contractor to complete to the Owner's satisfaction under <br />this Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />acknowledges and agrees that it will diligently proceed to complete all items on the <br />Statutory List and schedule a final walk-through in anticipation of final completion on the <br />Project." <br />SC -14.048 Add the following new paragraph immediately after paragraph GC 14.048: <br />C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to <br />Owner and Contractor a written recommendation as to division of responsibilities pending final payment <br />between Owner and Contractor with respect to security, operation, safety, and protection of the Work, <br />maintenance, heat, utilities, insurance, and warranties and guarantees <br />SC -14.07 Final Payment <br />SC -14.07.C.1. Delete paragraph GC -14.07.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the "Local Government <br />Prompt Payment Act" , Florida Statutes section 218.70, et. seq. <br />SC -15.01 OWNER May Suspend Work <br />SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its place: <br />Supplementary Conditions - 00800-9 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 0-3—section 800 IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.