My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1—General Requirements, IRC -1707 <br />SECTION 01009 - SPECIAL PROVISIONS <br />1 1 (;FNFRAI <br />A. Visits to the construction site may be made by representatives of permitting or <br />governing bodies. Submit details of all instructions from the above to the <br />ENGINEER immediately. The Work will not be accepted by the OWNER until final <br />acceptance has been received from the various Regulatory Agencies having <br />jurisdiction. <br />B. Furnish sufficient labor, construction equipment and materials, and work such <br />hours, including night shifts and overtime operations, as may be necessary to <br />insure the prosecution of the work in accordance with the approved progress <br />schedule. If, in the opinion of the ENGINEER, the CONTRACTOR falls behind the <br />progress schedule, take such steps as may be necessary to improve progress, all <br />without additional cost to the OWNER. The ENGINEER shall be compensated for <br />his overtime services in accordance with the Supplementary Conditions, SC -6.02. <br />C. All salvageable material and equipment for which specific use, relocation or other <br />disposal is not specifically noted, shall remain the property of the OWNER and <br />shall be delivered to the OWNER at the following location: 4550 411t Street, at the <br />CONTRACTOR's expense. All material and equipment not in salvageable <br />condition, as determined by the ENGINEER and the OWNER, shall be disposed of <br />by the CONTRACTOR, at the CONTRACTOR's expense. <br />D. In addition to these Specifications all work must comply with the requirements of <br />the local governing agency, St. Johns River Water Management District, <br />Department of Environmental Protection, Army Corps of Engineers, Indian River <br />Farms Water Control District, and all other applicable State or Federal agencies' <br />specifications and permits. In the event of a conflict, the more stringent <br />specification or requirement shall govern. <br />E. Before performing any work outside the designated limits of the work site, secure <br />any necessary permits and authorization from the applicable owner, or verify in <br />writing that such has been previously obtained. Follow all requirements of any <br />said permits or authorization. Give the ENGINEER and appropriate owner ten (10) <br />days minimum notice before commencing construction operations outside the <br />designated limits of the work site. <br />+ + END OF SECTION + + <br />Special Provisions - 01009-1 <br />F1Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 1 GENERAL REQUIREMENTS - IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.