Laserfiche WebLink
Division 1— General Requirements, IRC -1707 <br />SECTION 01024 - FORCE ACCOUNT <br />1.1 GENERAL <br />A. CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to <br />perform additional work not covered on the Contract Drawings. The force Account is <br />intended as a contingency for unforeseen work. <br />1.2 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. The value of force <br />account work will be determined in accordance with Article 12 of the General Conditions. <br />+ + END OF SECTION + + <br />Force Account - 01024-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 1 GENERAL REQUIREMENTS - IRC-1707.docx <br />