My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1707 <br />SECTION 01610 - TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br />i�irdya�y 7_u <br />A. Make all arrangements for transportation, delivery and handling of equipment and <br />materials required for prosecution and completion of the Work. <br />B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to the site <br />only during regular working hours. Shipments shall be addressed and consigned to the <br />proper party giving name of Project, street number and city. Shipments shall not be <br />delivered to OWNER except where otherwise directed. <br />C. If necessary, to move stored materials and equipment during construction, <br />CONTRACTOR shall move or cause to be moved materials and equipment without any <br />additional compensation. <br />1 7 r1F1 I\/PPV <br />A. Arrange deliveries of products in accord with construction schedules and in ample time <br />to facilitate inspection prior to installation. <br />B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br />accommodate the following: <br />1. Work of other contractors, or OWNER. <br />2. Limitations of storage space. <br />3. Availability of equipment and personnel for handling products. <br />4. OWNER'S use of premises. <br />C. Do not have products delivered to project site until related Shop Drawings have been <br />approved by the ENGINEER. <br />D. Do not have products delivered to site until required storage facilities have been <br />provided. <br />E. Have products delivered to site in manufacturer's original, unopened, labeled <br />containers. Keep ENGINEER informed of delivery of all equipment to be incorporated in <br />the Work. <br />F. Partial deliveries of component parts of equipment shall be clearly marked to identify <br />the equipment, to permit easy accumulation of parts, and to facilitate assembly. <br />G. Immediately on delivery, Contractor shall inspect shipment to assure: <br />1. Product complies with requirements of Contract Documents and reviewed <br />submittals. <br />2. Quantities are correct. <br />3. Containers and packages are intact, labels are legible. <br />4. Products are properly protected and undamaged. <br />Transportation and Handling of Materials and Equipment - 01610-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 1 GENERAL REQUIREMENTS - IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.