4. Please clarify the location of the 6" x 8" edge curb shown in Figure 3 on C-008? Should this be a <br />separate line item? <br />The edge curb will be installed around edges of the pickleball courts that are adjacent to grass. <br />The curb is included with the sidewalk pay item (522-2) as it is 6 -inches thick, and is installed in <br />a similar manner to sidewalk (i.e. with form boards). No edge curb will be installed around the <br />tennis courts. <br />Does the water from the water fountain drain on to the ground or is it being piped to a specific <br />location for draining? <br />The water fountain will drain into the grass retention area adjacent to the fountain. <br />6. Can the water line being removed be isolated with existing valves? <br />There are valves in the vicinity of the water line to allow it to be isolated for modification. <br />What type of finish will the County require for the park benches, powder coat or galvanized? <br />The bench is called out as Powder Coat Finish, and as shown in the Detail on Sheet C-005 of the <br />plans. Final color will be provided prior to order. <br />8. Should the yard drain and clean outs be included under the 6" PVC drainage pipe? There is some <br />12" PVC pipe also. Include under this item? <br />Installation of the 6 -inch PVC drain pipe will include the pipe, fittings, clean-out, drainage <br />structure (YD -1), and concrete apron. The Pay Item, IRC -9 will be changed from a unit price to a <br />lump sum price in Addendum 1. The 12 -inch discharge pipe connected to the outfall structure <br />is HDPE (High Density Polyethylene) and is included in the structure installation as noted in the <br />Technical Provisions Division 2, Section 425. <br />9. Note 11 on plan sheet C-002, says to remove septic tank system and restore. Where is the septic <br />tank located? What size is the tank? <br />Note 11 on Plan Sheet C-002, Erosion Control and Demolition Plan, can be disregarded as there <br />is no septic system on-site to be removed. The revised Plan Sheet C-002, Erosion Control and <br />Demolition Plan is included in Addendum 1. <br />10. Demo note says to remove unsuitable materials. Is there a geotechnical report for this site? <br />A soils report from a previous project in the north section of the Park is provided in Addendum <br />1. The report only provides a representative description of soils to a depth of 8 -feet below <br />grade, with no opinion on suitability for construction. It is the responsibility of the Contractor <br />to demonstrate by testing that the soils used will meet the compaction requirements specified <br />in the contract documents. <br />11. Note 3 on plan sheet C-002 says contractor to obtain demolition permits. What fees, if any, are <br />associated with said permits? <br />Page 2 of 3 <br />F:\PW-Purchasing\IRC-2204 Dick Bird Park Pickleball\Addendum 1\Back-up Documents\IRC-2204 ADDENI 20220720.doc <br />