My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-175
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 12:00:14 PM
Creation date
10/6/2022 11:58:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/13/2022
Control Number
2022-175
Agenda Item Number
12.H.1.
Entity Name
Tetra Tech, Inc.
Subject
Work Order 9 for Water Quality Study and Potable Water Treatment Facility Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. PROVIDED BY COUNTY <br />Information including, but not limited to the following, to be provided by the County to facilitate <br />performing the scope of services: <br />• Monthly operating reports <br />• Finished water quality goals <br />• Chemical usage and dosages <br />• Historical raw, permeate, blended and finished water quality <br />• Membrane skid array, number of vessels, membranes per vessel, membrane manufacturer and <br />type, design flux, age, and first stage permeate backpressure or energy recovery device <br />information, if applicable <br />• Detailed process schematic for each of the water treatment plants <br />• Distribution water quality sampling data <br />• Lead and copper sampling data <br />• Historical customers comments received <br />IV. COMPENSATION SUMMARY <br />Attachment B presents a more detailed breakdown of the estimated compensation defined in the Scope <br />of Services. The total lump sum compensation for this proposal is $84,003. The County will be invoiced <br />monthly for charges incurred during the previous month and submit the invoice to the Water Wastewater <br />Operations Manager by the 15th of the following month. <br />Scope <br />Task 1— Preliminary Work Tasks <br />$8,561 <br />Task 2 — Process and Finished Water Quality Evaluation <br />12,981 <br />Task 3 — Distribution System Water Quality <br />32,056 <br />Task 4—Project Updates <br />7,089 <br />Task 5 — Summary Report <br />23,316 <br />Total <br />$84,003 <br />BLK/sl/IRCDUS Evaluation D TETRATECH <br />Tt # 200BP Toho -4- 08/31/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.