Laserfiche WebLink
EXHIBIT A — SCOPE OF WORK <br />Task 1— Modification of Plans <br />The COUNTY desires to modify the previously prepares plans for the restroom facilities at the southern <br />portion of Hobart Park along with the supporting water and sewer utilities servicing the building. The <br />COUNTY is proposing to modify the proposed restroom facility and construct a facility which is not a <br />prefabricated building. Also, it is understood that the golf course to the south, Sandridge, is also owned <br />by the COUNTY, and the COUNTY has hired a third part engineer to design an expansion of the golf course <br />building and route the sanitary through Hobart park and past the proposed restroom facility. As part of <br />this scope Kimley Horn will modify the sewergravity locations from the building to the proposed lift station, <br />and tie in the proposed forcemain to the forcemain proposed by the golf course engineers. <br />Kimley-Horn will update the dimensional site plan that conforms to local agency having jurisdiction <br />permitting requirements which will depict the location of the proposed restrooms, sidewalks and landings <br />and existing surrounding features. <br />Kimley-Horn will update the limited Paving and Grading plan showing the proposed finished floor elevation <br />of the proposed restroom facilities and surrounding grades of proposed sidewalks. The plan will identify <br />paved areas for proposed sidewalk and associated details. <br />Kimley-Horn will update the limited Utility plan showing the existing utilities provided by COUNTY GIS data <br />and as-builts on 77th Street. Kimley Horn will coordinate with the architect of the COUNTY selected <br />restroom facility to identify the inverts of the water and sanitary inverts leaving the proposed restroom <br />facility. <br />Kimley-Horn also understands that the client desires to connect the existing restroom east of the existing <br />drainage canal to the public force main to the north. The modified plans will incorporate a proposed lift <br />station and force main connection to the public system. This task consists of the effort for Kimley-Horn to <br />coordinate with MOPS to prepare lift station design plans for the existing restroom facility. <br />In summary, the following plans will be updated by the Consultant: <br />• Site Plan • Utility Plan <br />• Paving and Grading Plan • Detail Sheets <br />Kimley-Horn will revise the plans to address up to one (1) round of comments from each of the permitting <br />agencies under Task 3. <br />Kimley-Horn will prepare quantity take offs to incorporate into an engineering opinion of probable cost as <br />part of this task. The unit costs estimates will be based on pricing information provided by contractors for <br />previous projects completed. The opinion of probable cost will also be based on assumptions that will be <br />outlined in the document. <br />Kimley-Horn anticipates that electric service to the proposed restroom facility can be run off of the existing <br />service line to the existing restroom facility on the west side of the park. Kimley-Horn will conceptually <br />show a single PVC conduit to house a single phase 200 -amp service from the existing restroom facility to <br />the proposed restroom facility on the utility plan. This will not be in the area of the limited topographic <br />survey and will be shown on the utility plan for reference to the contractor. <br />