My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-156A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-156A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 11:10:00 AM
Creation date
10/21/2022 11:09:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/16/2022
Control Number
2022-156A
Agenda Item Number
8.AO.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 1 to Work Order 25 for Hobart Park Renovations,
Restroom Connections and Utility Service Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A — SCOPE OF WORK <br />Task 1— Modification of Plans <br />The COUNTY desires to modify the previously prepares plans for the restroom facilities at the southern <br />portion of Hobart Park along with the supporting water and sewer utilities servicing the building. The <br />COUNTY is proposing to modify the proposed restroom facility and construct a facility which is not a <br />prefabricated building. Also, it is understood that the golf course to the south, Sandridge, is also owned <br />by the COUNTY, and the COUNTY has hired a third part engineer to design an expansion of the golf course <br />building and route the sanitary through Hobart park and past the proposed restroom facility. As part of <br />this scope Kimley Horn will modify the sewergravity locations from the building to the proposed lift station, <br />and tie in the proposed forcemain to the forcemain proposed by the golf course engineers. <br />Kimley-Horn will update the dimensional site plan that conforms to local agency having jurisdiction <br />permitting requirements which will depict the location of the proposed restrooms, sidewalks and landings <br />and existing surrounding features. <br />Kimley-Horn will update the limited Paving and Grading plan showing the proposed finished floor elevation <br />of the proposed restroom facilities and surrounding grades of proposed sidewalks. The plan will identify <br />paved areas for proposed sidewalk and associated details. <br />Kimley-Horn will update the limited Utility plan showing the existing utilities provided by COUNTY GIS data <br />and as-builts on 77th Street. Kimley Horn will coordinate with the architect of the COUNTY selected <br />restroom facility to identify the inverts of the water and sanitary inverts leaving the proposed restroom <br />facility. <br />Kimley-Horn also understands that the client desires to connect the existing restroom east of the existing <br />drainage canal to the public force main to the north. The modified plans will incorporate a proposed lift <br />station and force main connection to the public system. This task consists of the effort for Kimley-Horn to <br />coordinate with MOPS to prepare lift station design plans for the existing restroom facility. <br />In summary, the following plans will be updated by the Consultant: <br />• Site Plan • Utility Plan <br />• Paving and Grading Plan • Detail Sheets <br />Kimley-Horn will revise the plans to address up to one (1) round of comments from each of the permitting <br />agencies under Task 3. <br />Kimley-Horn will prepare quantity take offs to incorporate into an engineering opinion of probable cost as <br />part of this task. The unit costs estimates will be based on pricing information provided by contractors for <br />previous projects completed. The opinion of probable cost will also be based on assumptions that will be <br />outlined in the document. <br />Kimley-Horn anticipates that electric service to the proposed restroom facility can be run off of the existing <br />service line to the existing restroom facility on the west side of the park. Kimley-Horn will conceptually <br />show a single PVC conduit to house a single phase 200 -amp service from the existing restroom facility to <br />the proposed restroom facility on the utility plan. This will not be in the area of the limited topographic <br />survey and will be shown on the utility plan for reference to the contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.