Laserfiche WebLink
Task 2 — Sandridge Golf Course Design Coordination <br />Kimley-Horn understands that the COUNTY has hired an engineer to design the expansion to the existing <br />Sandridge golf course building. As part of this expansion, a sewer connection will be proposed through <br />Hobart Park. This task consists of up to 15 hours of effort to coordinate the design of the propose Sandridge <br />golf course building plans and the proposed restroom facility plan updates. <br />Task 3 - Permitting <br />As part of this scope Kimley Horn will prepare applications and supporting documentation forthe necessary <br />permits, which have expired, to construct the new restroom facility and utility services to both the eastern <br />existing restroom facility and the new restroom facility. <br />Kimley-Horn will submit for a utility construction permit for potable water and sanitary sewer. This <br />application will consist the equivalent residential use determination, projected water and sewer flows and <br />associated plans. <br />Kimley-Horn will prepare the supporting documentation to submit for an Indian River County Type A <br />stormwater permit. <br />It is assumed that the utility design will consist of connection to the Sandridge design well before the canal <br />crossing at 77th for the proposed restroom. All permitting with Indian River Farms Water Control District <br />on the proposed utility crossings on their canal would be completed by the Sandridge Golf Course <br />expansion engineer. <br />Due to the limited nature of the work, Kimley Horn does not anticipate more than one round of comments <br />from each of the agencies having jurisdiction above. Kimley-Horn will respond to up to one round of <br />comments from the permitting jurisdictions above as part of this task. <br />In summary the following permits are anticipated: <br />Indian River County Utility Construction Permit for Potable Water and Sanitary Sewer <br />Indian County Type A Stormwater Permit exemption <br />EXHIBIT B — FEE SCHEDULE <br />The COUNTY agrees to pay, and the Consultant agrees to accept for services rendered pursuant to this <br />Agreement fees inclusive of expenses in accordance with the following: <br />A. Professional Services Fee <br />The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: <br />Lump Sum Components <br />Task Labor Fee <br />Modification of Plans $ 7,500 <br />Sandridge Design Coordination $ 2,800 <br />Permitting $2,800 <br />TOTAL $13,100 <br />