My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-156A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-156A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 11:10:00 AM
Creation date
10/21/2022 11:09:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/16/2022
Control Number
2022-156A
Agenda Item Number
8.AO.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 1 to Work Order 25 for Hobart Park Renovations,
Restroom Connections and Utility Service Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 — Sandridge Golf Course Design Coordination <br />Kimley-Horn understands that the COUNTY has hired an engineer to design the expansion to the existing <br />Sandridge golf course building. As part of this expansion, a sewer connection will be proposed through <br />Hobart Park. This task consists of up to 15 hours of effort to coordinate the design of the propose Sandridge <br />golf course building plans and the proposed restroom facility plan updates. <br />Task 3 - Permitting <br />As part of this scope Kimley Horn will prepare applications and supporting documentation forthe necessary <br />permits, which have expired, to construct the new restroom facility and utility services to both the eastern <br />existing restroom facility and the new restroom facility. <br />Kimley-Horn will submit for a utility construction permit for potable water and sanitary sewer. This <br />application will consist the equivalent residential use determination, projected water and sewer flows and <br />associated plans. <br />Kimley-Horn will prepare the supporting documentation to submit for an Indian River County Type A <br />stormwater permit. <br />It is assumed that the utility design will consist of connection to the Sandridge design well before the canal <br />crossing at 77th for the proposed restroom. All permitting with Indian River Farms Water Control District <br />on the proposed utility crossings on their canal would be completed by the Sandridge Golf Course <br />expansion engineer. <br />Due to the limited nature of the work, Kimley Horn does not anticipate more than one round of comments <br />from each of the agencies having jurisdiction above. Kimley-Horn will respond to up to one round of <br />comments from the permitting jurisdictions above as part of this task. <br />In summary the following permits are anticipated: <br />Indian River County Utility Construction Permit for Potable Water and Sanitary Sewer <br />Indian County Type A Stormwater Permit exemption <br />EXHIBIT B — FEE SCHEDULE <br />The COUNTY agrees to pay, and the Consultant agrees to accept for services rendered pursuant to this <br />Agreement fees inclusive of expenses in accordance with the following: <br />A. Professional Services Fee <br />The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: <br />Lump Sum Components <br />Task Labor Fee <br />Modification of Plans $ 7,500 <br />Sandridge Design Coordination $ 2,800 <br />Permitting $2,800 <br />TOTAL $13,100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.