My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-207
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2022 3:09:15 PM
Creation date
10/31/2022 3:08:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/11/2022
Control Number
2022-207
Agenda Item Number
8.E.
Entity Name
Bowman Consulting Group, LTD
Subject
Work Order 13, CCNA2018 West Wabasso Septic to Sewer Phase 3A
61st Drive Engineering Design and Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCNA2018 WORK ORDER 13 <br />Bowman Consulting Group, LTD. <br />West Wabasso Septic to Sewer Phase 3A (6155 Drive) <br />of the subject properties and obtain an environmental resource permit (ERP) from the St. Johns River Water <br />Management District (SJRWMD). <br />Task 4 — Bid Documents and Bidding Assistance <br />Bowman shall revise the "West Wabasso Septic to Sewer Phase 313" bid documents to be specific to the Phase <br />3A (61St Drive) project. This task shall include attendance of the pre-bid and bid opening, assistance addressing <br />requests for information (RFI's) during the bid process, and a recommendation of bid award. <br />SERVICES NOT INCLUDED <br />• Boundary Survey of 8685 61ST Drive (Lift Station Site) <br />• Construction Observation & Certification <br />EXHIBIT B — FEE SCHEDULE <br />Bowman will provide the services described above for the following lump sum fees: <br />Task 1— Engineering Design & Survey $21,500.00 <br />Task 2 — Permitting <br />$ 5,250.00 (inc. Application Fees) <br />Task 3 — Environmental Resource Permitting $ 8,000.00 <br />Task 4— Bid Documents and Bidding Assistance $ 4,500.00 <br />Total: $ 39,250.00 <br />Services will be invoiced monthly. Lump sum invoices will reflect the percentage of the task completed. <br />EXHIBIT C —TIME SCHEDULE <br />This Task Order shall commence upon Notice to Proceed with the work to be completed as follows: <br />Task 1— Engineering Design & Survey 60 Days <br />Task 2 — Permitting 60 Days following Task 1 <br />Task 3 — Environmental Resource Permitting 60 Days Concurrent with Task 2 <br />Task 4 — Bid Documents and Bidding Assistance 30 Days following Tasks 2 & 3 <br />Total: 150 Days <br />
The URL can be used to link to this page
Your browser does not support the video tag.