My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-212
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 11:12:23 AM
Creation date
11/14/2022 11:11:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/18/2022
Control Number
2022-212
Agenda Item Number
8.H.
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Work Order Number 4 for Water Main Extension 51st Court
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT `1' <br />SCOPE OF WORK <br />WORK ORDER NO.4 <br />Project Description <br />The proposed project will provide surveying, engineering design and permitting for the construction <br />of a new 8" water main along 5Is' Ct, from 531 St north approximately 3301f crossing the IRFWCD <br />250' canal ROW. The water main will provide an interconnection and loop the current water <br />distribution system serving the Vero Lago development and Waterway Village development. A <br />portion of the water main will cross the existing IRFWCD canal on the existing utility shelf of the <br />exiting concrete bridge which spans the canal. <br />The construction will provide existing utility customers that currently are served by water distribution <br />systems an additional connection to a water transmission main on 53rs Street, which will provide a <br />higher level of assurance and security of the availability of water in the event of an unforeseen <br />operation failure, maintenance requirement or other event that could temporarily close existing water <br />service connections to the IRC distribution system serving this area. <br />Scope of Services <br />Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, engineering design, <br />preparation of construction plans, preparation and submittal of permit applications, preparation of <br />contract / bid documents, construction administration and periodic construction field inspection for the <br />construction of the new 8" water main along 51 at Ct north of 53'a Street, adjacent to the Vero Lago and <br />Waterway Village communities. (See Attachment "A" for location and Attachment "B" for <br />construction cost estimate, and Attachment "C" for preliminary plan). <br />The estimated cost for this project is $197,265.00. <br />In connection with this project, the County will provide the Engineer with a copy of any pertinent <br />Preliminary Data or Reports; all available drawings in electronic AutoCADD format; all surveys, <br />maps and other documentation in the possession of or reasonably available to the County that are <br />pertinent to the project. <br />Services not included in this scope of services are listed as follows: <br />• Excavation for field verification of actual locations of existing underground utilities <br />and structures. It is requested that Indian River County provide the excavation as <br />directed by Schulke, Bittle & Stoddard, L.L.C. <br />• Any services associated with assisting Indian River County in review and evaluation <br />of patent related disputes, issues, or claims including preparing to serve or serving as <br />a consultant or witness for Indian River County in litigation, arbitration, public or <br />private hearings, or other legal administrative proceedings involving patent related <br />disputes, issues or claims. <br />• Any services in connection with the project not otherwise provided for in this scope <br />of services. <br />In order to execute this project in the most cost effective manner with the most aggressive schedule, <br />Schulke, Bittle & Stoddard, L.L.C. is retaining Meridian Land Surveying to prepare a route survey <br />necessary for the design and construction of the project, and IF REQUIRED, will retain KSM <br />Engineering and Testing, Inc., for the geotechnical evaluation of the soils within the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.