Laserfiche WebLink
5. Conceptual Closing / Opening Plan. The conceptual plan and timeline noted below are by way of example <br />only and are subject to change depending upon storm size/scope/severity and upon input from Republic Services <br />and Indian River County. The safety of personnel, property, and equipment is Republic Services' top priority, and <br />Republic Services acknowledges that Indian River County desires to re -open the Landfill and the CCCs as soon as <br />possible after a storm. <br />A) Pre -Storm. Upon the approach of a named storm, Republic Services and Indian River County will conduct <br />daily conference calls as part of planning and preparation. These calls will take place at 3pm or a mutually <br />agreed upon time. <br />I) Between 48-72 Hours Out <br />a. Close Oslo and Fellsmere. <br />b. Redeploy Oslo and Fellsmere staff to other CCCs to assist as necessary, allowing Republic <br />Services employees to rotate out to prepare their families and homes. In addition, it allows <br />Republic Services equipment to be used at other CCCs in preparation after Oslo and Fellsmere <br />are cleaned and ready for post storm. <br />c. Conduct PSA to inform residents and businesses. <br />II) Between 24-48 Hours Out <br />a. Suspend all garbage and recycle collection. <br />b. All haulers advised of anticipated Landfill closure so they can have their trucks dumped and <br />ready for post storm clean up. <br />III) Between 12-24 Hours Out <br />a. All CCCs and Landfill closed to public. <br />b. Haulers contacted. <br />c. Begin shut down of Landfill operations and prepare road base for post storm. <br />B) Post -Storm. Following the removal of any restrictions/travel bans, Republic Services and SWDD will <br />conduct an inspection of the Landfill and equipment, and an inspection of the CCCs, as soon as possible, <br />and report its findings to Indian River County. <br />I) A staggered opening of CCCs will occur, with Oslo and Fellsmere being first, allowing the other 3 <br />CCCs to be cleaned and prepped for opening. <br />II) Additional resources will be contacted and in place to deploy at Republic Services' direction. <br />III) Between 24-72 Hours Post -Storm (depending on severity) <br />a. Resume normal garbage and recycle collection. <br />b. Alternate sites identified, if necessary, for storm debris. <br />