Laserfiche WebLink
Indian River Boulevard Resurfacing <br />Proposal No. 18-7910.02 REVISED 3 <br />GFA proposes the following estimated budget: <br />October 24, 2022 <br />Description <br />Pavement Area Soils <br />Qty. <br />Total <br />Stabilized Subgrade Density - Pavement* <br />$25.00 Each <br />56 <br />$1,400.00 <br />Base Density* <br />$25.00 Each <br />56 <br />$1,400.00 <br />Back Scatter Asphalt Density* <br />$25.00 Each <br />56 <br />$1,400.00 <br />Asphalt Testing <br />Box Samples Extraction Gradation Test <br />$200.00 Each <br />16 <br />$3,200.00 <br />Asphalt Cores for Density and Thickness <br />$85.00 Each <br />16 <br />$1,360.00 <br />Sampling Hot Asphalt At time Of Placement 16 Visits/2 hrs/Visit <br />$63.00 Hour <br />32 <br />$2,016.00 <br />Asphalt Lab Monitoring - Plant One Inspector <br />$70.00 Hour <br />10 <br />$700.00 <br />Laboratory Testing <br />Stabilized Subgrade Limerock Bearing Ratio (LBR) <br />$320.00 Each <br />28 <br />$8,960.00 <br />Underground Utilities Below Pavement <br />Fiber Optic Cable Backfill Density* <br />$25.00 Each <br />160 <br />$4,000.00 <br />Engineering Review of Test Results <br />Review of Test Results by Professional Engineer <br />$150.00 Hour <br />10 <br />$1,500.00 <br />Technician Time <br />Technician Time <br />$63.00 Hour <br />52 <br />$3,276.00 <br />Technician Time for Asphalt Temperature Monitoring <br />$63.00 Hour <br />40 <br />$2,520.00 <br />Project Manager / Quality Control Manager <br />$130.00 Hour <br />6 <br />$780.00 <br />Clerical <br />$50.00 Hour <br />4 <br />$200.00 <br />Full -Time Monitoring of Backfill (If Needed) <br />$63.00 Hour <br />TBD <br />ESTIMATED TOTAL: <br />$32,712.00 <br />Minimum 4 tests per trip and/or hour <br />" Minimum 1 set per trip and/or hour <br />GFA International will only invoice for actual services performed, potentially resulting in a lower final <br />cost. <br />Billing will be for actual tests performed per the unit fee schedules presented above. The above unit rates and/or <br />hourly rates do not include any overtime work. Overtime work (scheduled for before 7:00am or going past 4:00pm <br />Monday through Friday, more than 8 hours in one day, more than 40 hours in one week, or anytime on Saturdays, <br />Sundays, or Holidays), will be charged at the standard rate times 1.5. Technician Time will be charged in the <br />event that the Contractor's work is not ready for testing/inspection upon arrival of GFA's representative, or if our <br />minimum testing frequencies specified herein cannot be achieved. <br />A typed report signed and sealed by a State of Florida Registered Professional Engineer will be provided. In <br />accordance with Florida Statues Chapter 471 and the rules of the Florida Board of Professional Engineers <br />(Chapter 61 G15), a Professional Engineer is required to perform a thorough review of each report before affixing <br />his/her seal and signing for certification for each report's validity. <br />2020 GFA International, Inc. All Rights Reserved. SAL -000025R9 Page 4 of 7 <br />