My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-220
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 1:02:27 PM
Creation date
11/18/2022 3:59:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/01/2022
Control Number
2022-220
Agenda Item Number
8.K.
Entity Name
GFA International, Inc.
Subject
Work Order No. 2 for Indian River Boulevard Resurfacing from
from 53rd Street to the Merrill Barber Bridge,
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River Boulevard Resurfacing October 24, 2022 <br />Proposal No. 18-7910.02 REVISED 3 <br />CONDITIONS AND QUALIFICATIONS <br />Please note that GFA's services do not include supervision or direction of the actual work. Also, be aware that <br />neither the presence of our field representative nor the observation and testing by our firm shall imply GFA's <br />responsibility for defects discovered in the construction work. It is understood that GFA will not be responsible <br />for job or site safety on this project. Job site safety will be the sole responsibility of the contractor. <br />In this proposal the words "inspection" and "verify" are used to mean observation of the work and the conducting <br />of tests by GFA to determine substantial compliance with plans, specifications and design concepts. <br />These services include an engineering technician or inspector, field sampling, travel, test equipment and a typed <br />report signed and sealed by a State of Florida Registered Professional Engineer. The rates for professional <br />engineering services apply to report review, site visits and meetings, consultations, engineering letters, and <br />letters of intent and certification. <br />The overall cost of construction quality control programs is dependent upon the contractor's scheduling, weather <br />and other factors beyond our control. However, you will only be invoiced for services rendered. Hourly rates <br />will be charged in whole hour increments with fractions of an hour rounded up to the next full hour. All hourly <br />labor rates are portal to portal. <br />02020 GFA International, Inc. All Rights Reserved. SAL -000025R9 Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.