My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 12:53:37 PM
Creation date
11/23/2022 12:50:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work No. 56 for Central (Gifford) Wastewater
Treatment Plant Generator Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT #A <br />Indian River County Department of Utility Services <br />Central (Gifford) Wastewater Treatment Plant Generator Replacement <br />PROJECT UNDERSTANDING <br />Indian River County Department of Utility Services (IRCDUS) owns and operates the <br />Central (Gifford) Wastewater Treatment Plants (WWTP), which has two (2) standby <br />generators to provide emergency backup power to maintain operations during instances <br />of utility primary power loss. The following information is provided on the existing <br />generators: <br />Central WWTP <br />o One 1,000 -kW generator with 5,200 -gallon aboveground diesel fuel <br />storage tank & day tank, and <br />o One (1) 365 -kW generator with 2,000 -gallon aboveground diesel fuel <br />storage tank & day tank <br />The generators are reaching the end of their useful life and replacement is necessary. <br />Kimley-Horn recently prepared an evaluation of the existing generators at the North, <br />Central and South WWTPs which outlined recommendations for replacement. As part <br />of the Central WWTP evaluation, the following recommendations were provided: <br />• Eliminate the existing 365 -kW generator <br />• Replace the existing 1,000 -kW generator with new, equal size unit <br />• Replace the two (2) existing Automatic Transfer Switches (ATS) with new <br />• Replace day tank and generator exhaust <br />• Structural modifications to facilitate replacement <br />The following scope is provided to prepare design documents for the proposed <br />improvements, assist with bidding of the proposed improvements and construction <br />phase services. <br />SCOPE OF SERVICES <br />TASK 1— Design Phase Services <br />Consultant will utilize the services of C&W Engineering to provide electrical <br />engineering professional services related to design, bid and construction phase for the <br />proposed generator replacement. <br />Consultant will perform up to two (2) site visits to confirm/verify existing field <br />conditions in preparation of the design documentation. <br />\\wpbfiler0l\Project0l\FL_WPB\Data\WPB_Civil\General\Black\Florida\IRCU\Central WWTP Generator Replacement\20221013 <br />- DRAFT Gifford WWTP Gen .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.