My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 12:53:37 PM
Creation date
11/23/2022 12:50:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work No. 56 for Central (Gifford) Wastewater
Treatment Plant Generator Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will prepare design documents for replacement of the existing diesel day <br />tank and fuel piping to/from the proposed generator. <br />Consultant will design the replacement exhaust piping and silencer. Since IRCDUS is <br />not on Florida Power and Light Load Shedding Agreement, the exhaust system will be <br />standard sound attenuation and will not include SOx/NOx emissions reduction. <br />Consultant will prepare design for replacement of sound attenuation wall to be replaced <br />as part of the generator replacement. <br />Consultant will develop demolition drawings for the existing 365 -kW generator, diesel <br />day tank and bulk tank. <br />Consultant will provide suggested phasing for the proposed improvements. <br />It is assumed approximately 25 sheets will be generated as part of the design <br />documents. <br />Consultant will prepare 90% deliverable review package consisting of plans, <br />specifications and Opinion of Probable Construction Costs (OPCC) and submit to <br />IRCDUS. Consultant will prepare finalized design documents based on IRCDUS <br />comments and use for bidding. <br />Consultant will attend one (1) meeting with IRCDUS. Consultant will incorporate <br />comments from Client, fmalize and submit the documents to IRCDUS for bidding. <br />Task 2 — Bid Phase Services <br />IRC purchasing department will advertise and administer the procurement of the <br />bidding and respond to potential bidder questions. Consultant will review IRC front- <br />end documentation and provide comments for IRC implementation for bidding. <br />Consultant will attend pre-bid meeting, respond to contractor or supplier questions and <br />prepare addendum(s), if required, which will be distributed to all the contract document <br />holders by IRC purchasing department. <br />Consultant will review bids, provide a summary of comments, and a letter that identifies <br />the lowest responsive, responsible bidder. <br />Task 3 — Construction Phase Services <br />Consultant will attend one (1) pre -construction meeting with the Client and the selected bidder. <br />Consultant will provide signed and sealed design documents to the Contractor for the building <br />permit application package. Consultant will respond to reasonable number of comments during <br />the permit application review. <br />\\wpbfi1er0I\Project0I\FL_WPB\Data\WPB_Civil\General\Black\Florida\IRCU\Central WWTP Generator Replacement\20221013 <br />- DRAFT Gifford WWTP Gen .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.