Consultant will visit the site up to four (4) times during construction. <br />Consultant will review payment applications and change order requests. We assume that three <br />(3) applications for payment will be submitted. <br />Consultant will issue clarifications and interpretations. <br />Consultant will review Shop Drawings and Samples. We anticipate that up to four (4) <br />submittals will be required for review with one round of return submittals for additional review. <br />Consultant will review the project at the substantial completion date and develop punchlist. It is <br />assumed that there will be a substantial completion walk through at the end of project. <br />Consultant will witness load -bank testing for the new generator with the Contractor and <br />generator supplier. <br />Consultant will conduct final walk through upon Contractor notification that the punchlist has <br />been completed. <br />Consultant will review Contractor's closeout documentation including record drawings, <br />Operation and Maintenance Manuals, Consent of Surety, Release of Liens, and final application <br />for payment. <br />SCHEDULE <br />Consultant will complete these tasks in a timely manner and mutually agreed upon <br />schedule. <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting <br />Engineering Services Agreement for Professional Services dated April 17', 2018, by <br />and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task 1: Design Phase Services $ 101,371 <br />Task 2: Bid Phase Services $ 7,330 <br />Task 3: Construction Phase Services $ 49,994 <br />Total Tasks 1-3: $ 158,696 <br />ADDITIONAL SERVICES <br />The following services can be provided as additional services under separate future task <br />order: <br />• Surveying and Mapping <br />\\wpbfiler0l \Project01 \FL_WW <br />TP W TP Generator Replacement\20221013 <br />- DRAFT Gifford WWTP Gen .doc <br />