My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-235
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 11:59:11 AM
Creation date
12/12/2022 11:57:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/15/2022
Control Number
2022-235
Agenda Item Number
8.G.
Entity Name
State of Florida Department of Transportation (FDOT)
Subject
Utility work by Highway Contractor Agreement for Extension and
Relocation Services of Utility Main Lines for the Interchange I-95 and Oslo Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
710-010-22 <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION UTILITIES <br />UTILIES <br />UTILITY WORK BY HIGHWAY CONTRACTOR AGREEMENT OGc-06119 <br />(AT UTILITY EXPENSE) <br />The technical special provisions which are a part of the Plans Package shall be prepared in <br />accordance with the FDOT's guidelines on preparation of technical special provisions and shall not <br />duplicate or change the general contracting provisions of the FDOT's Standard Specifications for <br />Road and Bridge Construction and any Supplemental Specifications, Special Provisions, or <br />Developmental Specifications of the FDOT for the Project. <br />UAO shall provide a copy of the proposed Plans Package to the FDOT, and to such other right of <br />way users as designated by the FDOT, for review at the following stages: Production. Prior to <br />submission of the proposed Plans Package for review at these stages, the UAO shall send the FDOT <br />a work progress schedule explaining how the UAO will meet the FDOT's production schedule. The <br />work progress schedule shall include the review stages, as well as other milestones necessary to <br />complete the Plans Package within the time specified in Subparagraph a. above. <br />In the event that the FDOT finds any deficiencies in the Plans Package during the reviews performed <br />pursuant to Subparagraph f. above, the FDOT will notify the UAO in writing of the deficiencies and <br />the UAO will correct the deficiencies and return corrected documents within the time stated in the <br />notice. The FDOT's review and approval of the documents shall not relieve the UAO from <br />responsibility for subsequently discovered errors or omissions. <br />The FDOT shall furnish the LIAO such information from the FDOT's files as requested by the UAO; <br />however, the LIAO shall at all times be and remain solely responsible for proper preparation of the <br />Plans Package and for verifying all information necessary to properly prepare the Plans Package, <br />including survey information as to the location (both vertical and horizontal) of the Facilities. The <br />providing of information by the FDOT shall not relieve the UAO of this obligation nor transfer any of <br />that responsibility to the FDOT. <br />The Facilities and the Utility Work will include all utility facilities of the UAO which are located within <br />the limits of the Project, except as generally summarized as follows: Everything not specifically <br />included in the scope of services. These exceptions shall be handled by separate arrangement. <br />If any facilities of the LIAO located within the project limits are discovered after work on the project <br />commences to be qualified for relocation at the FDOT's expense, but not previously identified as <br />such, the UAO shall file a claim with the FDOT for recovery of the cost of relocation thereof. The <br />filing of the claim shall not necessarily entitle the UAO to payment, and resolution of the claim shall <br />be based on a determination of fault for the error. The discovery of facilities not previously identified <br />as being qualified for relocation at the FDOT's expense shall not invalidate this Agreement. <br />k. The LIAO shall fully cooperate with all other right of way users in the preparation of the Plans <br />Package. Any conflicts that cannot be resolved through cooperation shall be resolved in the manner <br />determined by the FDOT. <br />Upon completion of the Utility Work, the Facilities shall be deemed to be located on the public road or <br />publicly owned rail corridor under and pursuant to the Utility Permit: TBD <br />(Note: It is the intent of this line to allow either attachment of or separate reference to the <br />permit). <br />2. Performance of Utility Work <br />a. The FDOT shall incorporate the Plans Package into its contract for construction of the Project. <br />b. The FDOT shall procure a contract for construction of the Project in accordance with the FDOT's <br />requirements. <br />If the portion of the bid of the contractor selected by the FDOT which is for performance of the Utility <br />Work exceeds the FDOT's official estimate for the Utility Work by more than ten percent (10%) and <br />Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.