My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-246
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 11:19:33 AM
Creation date
12/20/2022 11:09:33 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />15 November 2022 <br />Page 7 <br />accommodate construction of a new skid. Geosyntec has selected Andersen Andre Consulting <br />Engineers, Inc. (AACE) of Fort Pierce, Florida to serve as a drilling subcontractor to perform <br />these services. A copy of AACE's proposal is included as Attachment B. <br />A Geosyntec engineer will be on-site to supervise the work. The replacement gas probe location <br />will be surveyed using a portable GPS equipment. Upon completion of groundwater monitoring <br />well and LFG probe abandonment and replacement gas probe installation activities, <br />documentation will be submitted to FDEP in accordance with the requirements of the solid waste <br />permit. <br />SCHEDULE <br />Geosyntec has prepared a schedule for the site preparation work (Phase 1) of Cell 3, which is <br />included as Attachment C. The schedule, as presented, assumes a start date of 23 November <br />2022. Procurement of supplier and. or contractor will take place during the month of January <br />2023 with contractor selection and contract award completed by 31 January 2023. Site <br />preparation of Cell 3 is projected to require 2 to 3 months to complete. The abandonment and <br />replacement of groundwater monitoring wells and LFG probe will be completed in January 2023. <br />Thus, Cell 3 liner and leachate control system could be ready for construction by April 2023. <br />Geosyntec recognizes the importance of the schedule for SWDD and their need to obtain <br />additional disposal capacity for the Class I Landfill. Throughout the duration of the Project, <br />Geosyntec will work diligently to meet those milestones and the schedule developed for the <br />Project. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Phases 1 through 5 of this proposal is <br />summarized in the following table. A detailed budget estimate is provided as Attachment D. <br />Note that fee for the surveyor is included in Phase 4 and the drilling subcontractor's fee is <br />included in Phase 5. <br />NCP2022/XL222460/JL22072 Seemcnt 3 Cell 3 Site P=Daration.doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.