Mr. Himanshu Mehta, P. E. <br />15 November 2022 <br />Page 6 <br />site on a weekly basis (or as requested by the contractor) to collect soil samples from the off-site <br />borrow source soil stockpile for laboratory conformance testing (see below), monitor <br />construction progress, and conduct in-situ nuclear density and moisture content testing to <br />evaluate the adequacy of compaction of the subgrade. Soil samples from the off-site borrow <br />source will be tested by an independent geotechnical CQA laboratory for conformance with the <br />Technical Specifications and CQA Plan. <br />The CQA Technician will be responsible for CQA activities throughout the Project including <br />monitoring construction, coordinating soils testing (if needed), and maintaining documentation <br />of CQA activities at the site. Any non -conforming or questionable practices observed by <br />Geosyntec will be brought to the attention of the concerned parties for review and correction. <br />Task 4.2: CQA Surveying <br />Geosyntec will subcontract the services of a Registered Land Surveyor to provide the surveying <br />required and prepare the as -built record drawing of the Cell 3 subgrade construction. Geosyntec <br />has selected Peavey & Associates (Peavey) of Fort Meade, Florida to provide surveying services. <br />Peavey will assist SWDD staff in the subgrade preparation work and provide data to check <br />material quantities for measurement and payment purpose. A copy of Peavey's proposal is <br />enclosed as Attachment A. <br />Task 4.3: CM and Engineering Support Services <br />Geosyntec will provide CM and engineering support services throughout the duration of the site <br />preparation work. Construction management activities will include conducting pre -construction <br />and monthly construction progress meetings with the entity selected by the SWDD to prepare the <br />site for the construction. Geosyntec will evaluate Contractor payment requests, verify quantities <br />and conformance with the plans and specifications, and provide contract administration. <br />As part of this phase, Geosyntec will review laboratory conformance and field performance tests <br />results (performed through the Contractor) and as -built record drawings for inclusion in the <br />Cell 3 construction certification report. Geosyntec will therefore review all test results and <br />drawings to ensure compliance with the project specifications and FDEP-issued permit for the <br />Class I Landfill. <br />Phase 5: Abandonment of Existing Monitoring Wells <br />Construction of Cell 3 will require abandonment of two groundwater monitoring well clusters <br />(MW41 and MW -42). In addition, LFG migration monitoring probe GW -00011 that is located <br />close to the flare station would have to be abandoned and replaced with a new probe in order to <br />NCP2022/XL222460/1L2072 Segment { Cell 3 lite Prepurution doe <br />