My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-246
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 11:19:33 AM
Creation date
12/20/2022 11:09:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/22/2022
Control Number
2022-246
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 18 for Segment 3, Cell 3 Site Preparations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />15 November 2022 <br />Page 5 <br />Geosyntec will also prepare a construction schedule based on Geosyntec's understanding of the <br />Project and experience with similar landfill construction projects. <br />Phase 3 - Contractor Procurement Services <br />Under this phase, Geosyntec will prepare construction documents for procuring a construction <br />contractor for the Phase 1 construction. This will include preparation of the request for bid <br />(RFB) documents; attending the pre-bid meeting; responding to bidders' questions and preparing <br />required updates to the bidding document throughout the bids preparation process; evaluating <br />bids; and preparing a recommendation to SWDD of the preferred bid for Phase 1 construction. <br />Our budget is based on the assumption that the entire RFB package including the construction <br />drawings, specifications document, responses to questions and project update will be uploaded <br />by the County's Purchasing Division onto Demandstar website (or equivalent) where it will be <br />available for downloading by candidate contractors wishing to respond to the RFB. <br />Geosyntec will attend the pre-bid meeting with potential contractors to describe the Project and <br />its requirements and answer questions at the pre-bid meeting. During the bidding process, <br />Geosyntec will respond to written questions by issuing addenda. Preparation of addenda may <br />require revisions to the Construction Drawings or material quantities as necessary to allow <br />comparison and evaluation of bids from the contractors. Geosyntec will manage the <br />procurement process, review and evaluate the bids submitted in compliance with the <br />requirements of the RFB process, and prepare a recommendation with supporting rational for the <br />selection of the preferred candidate contractor for construction of Phase 1 of the Project. <br />Phase 4 - Construction -Phase Support Services <br />Geosyntec will provide CM engineering support services associated with construction of the <br />Cell 3 subgrade, including the following tasks: (i) Field CQA Services; (ii) CQA Surveying; and <br />(iii) CM and Engineering Support Services. <br />Task 4.1: Field CQA Services <br />Geosyntec will provide periodic CQA monitoring, testing, and documentation services to assist <br />SWDD staff (or contractor) on the subgrade preparation activities. CQA monitoring, testing <br />methods, test frequencies, and the reporting requirements will be performed in accordance with <br />the CQA Plan, ASTM standards, and applicable portions of Chapter 62-701, F.A.C. <br />Geosyntec will provide periodic on-site monitoring services for the activities associated with <br />construction of the subgrade. The periodic CQA services will be provided by a CQA Technician <br />on a weekly basis or as -needed by the selected contractor. The CQA Technician will visit the <br />NCP2022/XL22246Q1L22072-�e¢mcnt 3 Cell 3 Sit Preoa�tiun.doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.