My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-246
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 11:19:33 AM
Creation date
12/20/2022 11:09:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/22/2022
Control Number
2022-246
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 18 for Segment 3, Cell 3 Site Preparations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />15 November 2022 <br />Page 4 <br />For the purpose of this budget estimate, Geosyntec has included two meetings: (i) one kickoff <br />meeting with SWDD; and (ii) one meeting with SWDD following completion of Phase 2 below. <br />Phase 2 - Preparation of Construction Documents <br />Geosyntec will prepare the construction documents (i.e., drawings, technical specifications, <br />material quantities, and CQA Plan) required for SWDD to procure a contractor to prepare the <br />subgrade for Cell 3 of Segment 3. Geosyntec understands that SWDD might include in the bid <br />package an option for the selected contractor to also prepare the subgrade for Cell 4. Therefore, <br />Geosyntec will include relevant information on Cell 4 subgrade in the construction documents. <br />It is anticipated that the following drawings will be prepared: <br />1. Cover Sheet; <br />2. Existing Site Conditions; <br />3. Site Development Plan (will also show monitoring wells to be abandoned); <br />4. Subgrade Grading Plan; <br />5. Construction Control Points Data; <br />6. Perimeter Drainage Ditch Plan and Profile; <br />7. Cross Sections and Details (2 sheets); <br />8. Surface Water Drainage System Details; and <br />9. Erosion and Sediment Control Details. <br />The construction drawings will be prepared utilizing the Segment 3 Expansion Permit Drawings <br />prepared by Geosyntec in March 2010 and revised in November 2015. Construction control <br />points will be shown for the subgrade, drainage ditches, toes of slopes, and other locations <br />sufficient for the cell construction. <br />Technical Specifications and the CQA Plan will be compiled as part of the Construction <br />Documents. The specifications will be prepared using the industry -standard Construction <br />Specification Institute (CSI) format. Geosyntec will also prepare a bid sheet with estimate of <br />material quantities for the contractor procurement. <br />Geosyntec will prepare an Engineer's Estimate of Probable Construction Cost for the Project to <br />serve as a basis for comparison of bids during the procurement process. Probable construction <br />cost will be based on estimated construction quantities for the project and engineering estimate <br />of the probable unit cost for each item. Probable construction costs will be based on catalogues <br />such as R.S. Means, information provided by product manufacturers, and Geosyntec's <br />professional judgment and experience with similar projects. <br />NCP2022/XL22246Q1�-2 07� C�r¢ment 3 Cell 3 Sitc Preparatiun.doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.