My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-247
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:13:54 PM
Creation date
12/22/2022 12:11:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2022
Control Number
2022-247
Agenda Item Number
8.A.
Entity Name
Atkins
Subject
CCNA2018 Work Order 08 for Central WastewaterTreatment Facility
SludgeTank Odor Control Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 13", 2021 EWLEY <br />o c <br />Ms. Yvonne Picard, PE <br />ATKINS North America, Inc. <br />482 South Keller Road <br />Orlando, FL 32810-6101 <br />Re: Indian River Central WWTF Sludge Tank Odor Control Facility <br />Vero Beach, Florida <br />Dear Ms. Picard: <br />We are pleased to submit our proposal for electrical and instrumentation engineering services for <br />the above project. The following serves to provide an overview of the engineering services <br />Bailey Engineering Consultants, Inc. (BEC) intends to furnish on the above referenced project to <br />Atkins. Your signature on this agreement will serve as your letter of intent. Our services shall <br />include completed drawings for the work, specifications, opinion of probable construction cost <br />estimate covering all phases of our design in accordance with a format determined by you. Our <br />work scope shall include the following: <br />Task 01— Proiect Management & Progress Meetings <br />1. BEC shall attend the kick-off meeting for the project to discuss the detailed project <br />approach, the project schedule, and the budget. <br />Task 02 — Survey <br />1. By Others. <br />Task 03 — Preliminary Design Report <br />1. Data Collection, Review, and Conceptual Design <br />a. Conduct site visit as required to identify site -conditions for the associated electrical <br />and instrumentation improvements. <br />b. Evaluate options for the proposed improvements. <br />c. Attend one (1) meeting with CITY to present and review the findings and results of <br />the preliminary engineering. <br />2. Deliverables: <br />a. Draft Preliminary Design Report. BEC shall submit electronic copies in PDF. <br />Additional reproduction by others. <br />10620 GR,ITTIN ROAD, SVITE 202 • COOPER, CITT, AFL • 33328 <br />T,"CONE: 954-448-7930 • TAX. 954-713-9959 <br />
The URL can be used to link to this page
Your browser does not support the video tag.