My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-247
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:13:54 PM
Creation date
12/22/2022 12:11:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2022
Control Number
2022-247
Agenda Item Number
8.A.
Entity Name
Atkins
Subject
CCNA2018 Work Order 08 for Central WastewaterTreatment Facility
SludgeTank Odor Control Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Ms. Yvonne Picard, PE Page 2 May 13", 2021 <br />b. Final Preliminary Design Report. BEC shall submit electronic copies in PDF. <br />Additional reproduction by others. <br />Task 04 - Final Design <br />1. Design of electrical system and I&C as required for Odor Control facility. <br />2. Design of the interface with existing WWTF electrical and I&C system. <br />3. Miscellaneous Odor Control building electrical and I&C design. <br />4. Review and coordination of the Odor Control specifications. <br />5. Attend one (1) meeting as requested to review status and design requirements. <br />6. Deliverables: <br />a. 90% Submittal. BEC shall submit electronic copies of the plans (in AutoCAD <br />format and PDF), specifications (in MS Word and PDF) and cost opinion (in <br />PDF) to Atkins. Additional reproduction by others. <br />b. 100% Submittal. BEC shall submit electronic copies of the plans (in AutoCAD <br />format and PDF), specifications (in MS Word and PDF) and cost opinion (in <br />PDF) to Atkins. Additional reproduction by others. <br />Task 05 — Biddinp, Support Services <br />1. Pre -Bid meeting by others. <br />2. BEC will review the bid submittals and make a recommendation as related to electrical <br />and I&C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.