My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-247
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:13:54 PM
Creation date
12/22/2022 12:11:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2022
Control Number
2022-247
Agenda Item Number
8.A.
Entity Name
Atkins
Subject
CCNA2018 Work Order 08 for Central WastewaterTreatment Facility
SludgeTank Odor Control Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />INDIAN RIVER COUNTY UTILITIES DEPARTMENT <br />WORK ORDER No. 8 <br />Exhibit A: SCOPE OF SERVICES <br />Central WWTF Sludge Tank Odor Control Facility <br />Background <br />In March 2022, Indian River County Utilities Department (County) requested that Atkins <br />(Consultant) provide technical services to design an odor control system for the sludge holding <br />tank at the Central (Gifford) WWTF. The original odor control facility at this location was <br />demolished in 2012 as part of the Central Wastewater Treatment Facility Sludge Handling Facility <br />Modifications Project and was not replaced due to budget constraints. However, the adjacent <br />land is being developed and the County would like to ensure that any potential odor issues <br />associated with the sludge holding tanks are addressed. <br />To determine the scope of services required, Atkins visited the Central WWTF on March 25 and <br />discussed the anticipated improvements at the existing facility with County Staff. During that site <br />visit, it was determined that the integrity of existing odor control fiberglass reinforced piping <br />(FRP) had been compromised and would require replacement. In addition, it was determined <br />that there was sufficient space to locate the odor control facility on either side of the sludge <br />holding tank. <br />Scope of Services <br />This Scope of Services is for technical services associated with the design of an odor control <br />facility for the Central WWTF Sludge Holding Tank. Upon Notice to Proceed, the Consultant will <br />provide professional services associated with improvements. The design services will culminate <br />in Contract Bid Documents and will include permitting and bidding services. <br />Task 01 Project Management <br />a. General Project Administration <br />This task consists of overall management of the Project including contract <br />administration, budget management, invoicing, monthly status reports, project <br />scheduling, facilitating and coordinating internal design meetings, and <br />coordination with the Consultant's subconsultants. <br />b. Meetings <br />Consultant will facilitate three in-person submittal review workshops and up to six <br />virtual project progress meetings with the County, including scheduling, preparing <br />agendas and distributing meeting minutes. <br />Task 02 Survey <br />a. Survey <br />Surveying will be provided by the Consultant's in-house surveying crew. The <br />survey will be utilized to verify the elevations of existing grade and elements <br />
The URL can be used to link to this page
Your browser does not support the video tag.