2022-247
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:13:54 PM
Creation date
12/22/2022 12:11:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2022
Control Number
2022-247
Agenda Item Number
8.A.
Entity Name
Atkins
Subject
CCNA2018 Work Order 08 for Central WastewaterTreatment Facility
SludgeTank Odor Control Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Central WWTFSludge Tank Odor Control <br />Exhibit A. Scope of Work <br />ATKINS <br />associated with the sludge tanks and odor control piping and pipe supports at the <br />Central WWTF Sludge Tanks. <br />Task 03 Preliminary Design Report <br />a. Draft Preliminary Design Report <br />The Consultant will prepare a Preliminary Design Report (PDR) containing process <br />flow diagrams, preliminary equipment layouts and equipment cutsheets, and <br />preliminary electrical one -line diagrams. Upon submittal, the Consultant will <br />schedule a review meeting with County Staff. The Consultant will prepare a <br />meeting agenda and up to three members of the Consultant's Team will attend <br />the Workshop. Meeting notes will be taken by the Consultant and distributed <br />within three (3) days of the review meeting. <br />b. Final Preliminary Design Report <br />Following the Workshop, the PDR will be updated to address review comments. <br />One (1) electronic copy and two (2) hard copies of the Final PDR, along with an <br />electronic version of a spreadsheet showing adjudication of Client review <br />comments, will be provided to the County PM for distribution. <br />Task 04 Final Design <br />a. 90% Contract Documents <br />The Consultant will prepare and submit 90% construction documents. The <br />construction documents will consist of the following: <br />• Up to 20 technical specification sections inclusive of Division 1 and <br />technical specifications. <br />• Up to 25 design drawings including general, mechanical process, <br />structural, electrical, and instrumentation and control disciplines. The list <br />of drawings are provided in Exhibit A. <br />A draft Bid Form and Consultant's opinion of probable cost will be submitted with <br />the construction documents. <br />The Consultant will provide one (1) electronic copy and four (4) draft hard copies <br />to the County PM for distribution and review. Upon the submittal of the 90% <br />Design Documents, the Consultant will schedule an in-person meeting to discuss <br />review comments with the County PM and Plant Staff. Consultant will prepare a <br />meeting agenda and up to four members of the Consultant's Team will attend the <br />meeting. Meeting notes will be taken by the Consultant and distributed within <br />three (3) days of the review meeting. <br />b. 100% Contract Documents <br />The Consultant shall address comments from the 90% contract documents Review <br />Meeting and will prepare and submit 100% construction documents, consisting of <br />the following: <br />3 <br />