My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-247
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:13:54 PM
Creation date
12/22/2022 12:11:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2022
Control Number
2022-247
Agenda Item Number
8.A.
Entity Name
Atkins
Subject
CCNA2018 Work Order 08 for Central WastewaterTreatment Facility
SludgeTank Odor Control Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Central WWTF Sludge Tank Odor Control <br />Exhibit A. Scope of Work <br />Task <br />Review Meeting <br />Final Preliminary Design Report <br />90% Design <br />Review Meeting <br />Final Design — Bid Documents <br />Bidding Support Services <br />Quality Control <br />Duration from NTP <br />14 weeks <br />17 weeks <br />26 weeks <br />28 weeks <br />32 weeks <br />TBD <br />ATKINS <br />Consultant will be responsible for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by another qualified professional that was not responsible for preparing <br />the deliverable or calculation. <br />Assumptions <br />The following assumptions have been made in the development of this scope of work, <br />schedule, and fee: <br />General <br />• The record drawings, "as-builts," calculations, and information on any upgrades for the <br />sludge holding tank and I&C system are available and will be furnished to consultant. <br />• The design will be based on the federal, state, and local codes and standards in effect at <br />the start of the project. Any changes in these codes may necessitate a change in scope. <br />• The drawings will follow Atkins CAD standards. Atkins master specifications will be used <br />as the basis for Division 1 and all technical specifications. <br />• County Staff will provide Division 0 and associated front end documents. <br />• Electronic seal and signatures are acceptable. <br />• Attendees of the review meetings are designated as decision makers. <br />• Data requests will be addressed within five (5) calendar days. <br />• Facilities or areas to be surveyed are readily accessible. <br />• FDEP permitting is not required for this project. No permitting support or fees are <br />included in this scope. <br />Existing Conditions/ Scope of Work <br />• The existing electrical feed to the facility will be sufficient for any increase in power <br />required for the new odor control equipment. This will be verified during preliminary <br />engineering to allow adequate time for external coordination, if required. <br />• Landscaping will not be included in this project. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.