My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-247
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 12:13:54 PM
Creation date
12/22/2022 12:11:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2022
Control Number
2022-247
Agenda Item Number
8.A.
Entity Name
Atkins
Subject
CCNA2018 Work Order 08 for Central WastewaterTreatment Facility
SludgeTank Odor Control Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Central WWTF Sludge Tank Odor Control <br />Exhibit A. Scope of Work <br />ATKINS <br />• Existing concrete pads, driveways, stairways, and housekeeping pads will remain as is <br />and are sufficient for use in supporting the odor control system. New housekeeping <br />pads for the Odor Control system will be provided. <br />• The location of subsurface improvements such as underground utilities are not included <br />in this proposal. <br />Technical <br />• An overall hydraulic profile will not be included in the drawings. <br />• No site civil work beyond odorous air pipe routing will be required as part of this <br />project. <br />• No SCADA updates are required beyond 1/0 re-routing associated with odor control. <br />• The existing survey controls points are located on-site or no farther than a quarter mile <br />away from the facilities. <br />Exclusions <br />The following items are excluded from this scope of work: <br />• Destructive inspection. <br />• Material testing or sampling. <br />• Inspections of enclosed areas. <br />Compensation <br />Consultant proposes to perform the work described in Tasks 1— 5 on a Fixed Fee basis with <br />budgets between the sub -tasks and expenses being interchangeable as needed. The estimated <br />total engineering fee including labor and expenses associated with the scope of work is not to <br />exceed $129,149 as summarized in the table below and presented in detail in Exhibits B and D. <br />Task No. <br />Task <br />Fee <br />1 <br />Project Management <br />$18,282 <br />2 <br />Survey <br />$14,688 <br />3 <br />Preliminary Design Report <br />$32,590 <br />4 <br />Final Design <br />$55,025 <br />5 <br />Bidding Support Services <br />$7,134 <br />Expenses <br />$1,430 <br />Total Fee <br />$129,149 <br />R <br />
The URL can be used to link to this page
Your browser does not support the video tag.