My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/08/2022
CBCC
>
Meetings
>
2020's
>
2022
>
11/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 2:12:14 PM
Creation date
1/9/2023 1:45:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/08/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT #A <br />Indian River County Department of Utility Services <br />Central (Gifford) Wastewater Treatment Plant Generator Replacement <br />PROJECT UNDERSTANDING <br />Indian River County Department of Utility Services (IRCDUS) owns and operates the <br />Central (Gifford) Wastewater Treatment Plants (WWTP), which has two (2) standby <br />generators to provide emergency backup power to maintain operations during instances <br />of utility primary power loss. The following information is provided on the existing <br />generators: <br />Central WWTP <br />o One 1,000 -kW generator with 5,200 -gallon aboveground diesel fuel <br />storage tank & day tank, and <br />o One (1) 365 -kW generator with 2,000 -gallon aboveground diesel fuel <br />storage tank & day tank <br />The generators are reaching the end of their useful life and replacement is necessary. <br />Kimley-Horn recently prepared an evaluation of the existing generators at the North, <br />Central and South WWTPs which outlined recommendations for replacement. As part <br />of the Central WWTP evaluation, the following recommendations were provided: <br />• Eliminate the existing 365 -kW generator <br />• Replace the existing 1,000 -kW generator with new, equal size unit <br />• Replace the two (2) existing Automatic Transfer Switches (ATS) with new <br />• Replace day tank and generator exhaust <br />• Structural modifications to facilitate replacement <br />The following scope is provided to prepare design documents for the proposed <br />improvements, assist with bidding of the proposed improvements and construction <br />phase services. <br />SCOPE OF SERVICES <br />TASK 1— Design Phase Services <br />Consultant will utilize the services of C&W Engineering to provide electrical <br />engineering professional services related to design, bid and construction phase for the <br />proposed generator replacement. <br />Consultant will perform up to two (2) site visits to confirm/verify existing field <br />conditions in preparation of the design documentation. <br />K:\WPB—Civil\Gcneral\Black\Florida\IRCU\CentraI WWTP Generator Replacement\20221013 - Gifford WWTP Gen .doc 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.