Laserfiche WebLink
Consultant will prepare design documents for replacement of the existing diesel day <br />tank and fuel piping to/from the proposed generator. <br />Consultant will design the replacement exhaust piping and silencer. Since IRCDUS is <br />not on Florida Power and Light Load Shedding Agreement, the exhaust system will be <br />standard sound attenuation and will not include SOx/NOx emissions reduction. <br />Consultant will prepare design for replacement of sound attenuation wall to be replaced <br />as part of the generator replacement. <br />Consultant will develop demolition drawings for the existing 365 -kW generator, diesel <br />day tank and bulk tank. <br />Consultant will provide suggested phasing for the proposed improvements. <br />It is assumed approximately 25 sheets will be generated as part of the design <br />documents. <br />Consultant will prepare preliminary deliverable review package consisting of plans, <br />specifications and Opinion of Probable Construction Costs (OPCC) and submit to <br />IRCDUS. Consultant will prepare finalized design documents based on IRCDUS <br />comments and use for bidding. <br />Consultant will attend one (1) meeting with IRCDUS. Consultant will incorporate <br />comments from Client, finalize and submit the documents to IRCDUS for bidding. <br />Task 2 — Bid Phase Services <br />IRC purchasing department will advertise and administer the procurement of the <br />bidding and respond to potential bidder questions. Consultant will review IRC front- <br />end documentation and provide comments for IRC implementation for bidding. <br />Consultant will attend pre-bid meeting, respond to contractor or supplier questions and <br />prepare addendum(s), if required, which will be distributed to all the contract document <br />holders by IRC purchasing department. <br />Consultant will review bids, provide a summary of comments, and a letter that identifies <br />the lowest responsive, responsible bidder. <br />Task 3 — Construction Phase Services <br />Consultant will attend one (1) pre -construction meeting with the Client and the selected <br />bidder. <br />K:\WPB_Civil\General\Black\Florida\IRCU\Central W WTP Generator Replacement\20221013 - Gifford WWTP Gen .doc 73 <br />