My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-251A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-251A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 10:07:21 AM
Creation date
1/12/2023 10:06:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/06/2022
Control Number
2022-251A
Agenda Item Number
8.N.
Entity Name
TLC Diversified, Inc.
Subject
Change Order 2 for the South Water Treatment Plant Membrane and Retrofit Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />DATE OF ISSUANCE: November 30, 2022 EFFECTIVE DATE: <br />OWNER: Indian River County <br />OWNER's Contract No.: 2021026 <br />No. 2 <br />Project No.: 044572102 <br />CONTRACTOR: TLC Diversified, Inc ENGINEER: Kimley-Horn & Associates, Inc. <br />You are directed to make the following changes in the Contract Documents: <br />Description: This change order instructs the Contractor to furnish/install the following for the lump sum of <br />$150,020.17: <br />1. 14" and 30" line stops on existing high service pump suction line. Replacement of three (3) <br />existing 14" gate valves on the high service pump suction line that do not hold. <br />2. Emergency repair of the leak in the existing 18" transfer piping. <br />3. Removal of buried concrete vault based on unforeseen conditions in the field. <br />Attachments: Quotations <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times: <br />$ 10,665,515.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Net changes from previous Change Orders <br />Net change from previous Change Orders: <br />No. 1 $483,563.83 <br />No. to No. <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ 11,149,079.48 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ 150,020.17 <br />0 <br />days <br />Contract Price with all approved Change <br />Contract Time with all approved Change <br />Orders <br />Orders <br />$ 11,299,099.65 <br />Substantial Completion: 760 <br />Ready for.fippl payment: 820 <br />,.�y on�rT�ss�•,. ays or a es <br />REC N /YIelt A4fA" #.A P V <br />By: K, MUY, /&A By: <br />Engineer (Authorized Signature) Owner (Authors Signa <br />Date: ���� 2 Date: 12-06-2022 `' %%:� GL <br />�E�EPTED: <br />cu6tractor (Authorized Signature) <br />`�,-Date: O <br />EJCDC No. C-700 (2002 Edition) eff a R -S it , Clerk of <br />Prepared by the Engineers Joint Contract Documents Committee and endorsea i�C&w ptroller <br />General Contractors of America. <br />00800-24 <br />�s..ut <br />
The URL can be used to link to this page
Your browser does not support the video tag.