My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-251A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-251A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 10:07:21 AM
Creation date
1/12/2023 10:06:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/06/2022
Control Number
2022-251A
Agenda Item Number
8.N.
Entity Name
TLC Diversified, Inc.
Subject
Change Order 2 for the South Water Treatment Plant Membrane and Retrofit Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley-Horn 20 -November --2022 <br />1920 Wekiva Way, Suite 200 <br />West Palm Beach, FI 33411 <br />Attn: Mr. Nick Black, P.E. Nick.BlackCcDKimley-Horn.com <br />Reference: Request for 14" Valve Replacement, Repair of 18" Pipe and Removal of Vault, 30" <br />and 30" and 14" Line Stops. <br />Dear Mr. Black, <br />Please find a quotation for the changes requested as reference above. <br />Labor = <br />Material = <br />Subcontract = <br />Equipment = <br />Other= <br />Labor Burden = <br />Tax = <br />OH&Psubs 5%= <br />OH & P @ Self Perform 15% _ <br />Subtotal = <br />Bond = <br />Total ADD = <br />$ <br />9,450.00 <br />BOND HAS BEEN <br />$ <br />42,747.45 <br />ADDED AS THIS <br />$ <br />65,797.56 <br />WILL RESULT IN <br />$ <br />8,907.00 <br />CHANGE IN <br />$ <br />200.00 <br />CONTRACT PRICE. <br />$ <br />3,307.50 <br />$ <br />3,206.45 <br />$ <br />3,289.88 <br />$ <br />10,172.76 <br />$ 147,078.60 <br />$96- <br />1 lc*- <br />'' <br />$2,941.57 <br />d <br />$.60 <br />$150,020.17 <br />With the current supply chain delays that have been discussed in the project meetings it is <br />difficult to quantify the additional time required to quote this change. TLC is therefore reserving <br />our rights to additional time for the project that will be determined at a later date. Please provide <br />your acceptance of this additional work and issue a change order so that TLC can release the <br />required items for production. <br />Sincerely Yours, <br />"g, Fe'd, <br />John P. Elder (Project Manager) <br />PALMETTO WEST PALM BEACH TAMPA <br />Corporate Office 7233 Southern Blvd 12814 Dupont Circle <br />2719 17th St. East Suite B-1 Building 8, Suite 4-A <br />Palmetto, FL 34221 West Palm Beach, FL 33413 Tampa, FL 33626 <br />�. 941.722.0621 <br />f'1 941.722.1382 <br />CG C041816 CU C053963 <br />
The URL can be used to link to this page
Your browser does not support the video tag.