Laserfiche WebLink
ORDINANCE 2023- 001 <br />Those development projects, located in the St. John's Marsh and within either the <br />Terra Ceia, Holopaw, Delray, Canova, Gator, or Floridian soil types (as described <br />in the United States Department of Agriculture Soil Conservation Service Soil <br />Survey of Indian River County, latest edition) for which a cut and fill waiver has <br />been granted by the board of county commissioners. The board of county <br />commissioners may, in its discretion, grant a waiver from the provisions of this <br />subsection upon the affirmative showing of the applicant, by means of a competent <br />engineering study, that the development project, as designed, will meet all other <br />requirements of the stormwater management and flood protection chapter and will <br />not create a material adverse impact on flood protection. <br />d. Development located within the Vero Lake Estates Municipal Services Taxing <br />Unit as referenced in Ordinance No. 84-81, for which a cut and fill waiver has been <br />granted by the board of county commissioners. The board of county <br />commissioners may, in its discretion, grant a waiver from the provisions of this <br />subsection upon the affirmative showing of the applicant, by means of a competent <br />engineering study, that the development project, as designed, will meet all other <br />requirements of the stormwater management and flood protection chapter and will <br />not create a material adverse impact on flood protection. <br />e. Commercial or industrial development located within a commercial/industrial (C/n <br />area. In the public interest of promoting economic development in targeted <br />industries and in recognition of the limited impacts of commercial/industrial <br />development to base flood elevations within and adjacent to commercial/industrial <br />areassuch development is waived from the cut and fill requirements of this <br />subsection. To qualify for this waiver, all of the following requirements must be <br />met: <br />i. The base flood volume may not be displaced by more than 500 <br />cubic yards per acre, and the development site must be under five <br />(5) acres in size. <br />ii. A formal site plan implication through the Community <br />Development Department must be submitted for the respective <br />development. <br />iii. A formal engineering analysis, provided by a licensed professional <br />engineer, is required to demonstrate that no onsite or offsite <br />drainage impacts will result. The analysis must be recorded into <br />public record as part of the property's formal record. <br />iv. The site is located in a Commercial/Industrial Zoning District at the <br />time of the waiver adoption. <br />Notwithstanding this cut and fill waiver, such commercial or industrial development <br />shall be subiect to all other applicable stormwater management and flood protection <br />regulations in this chapter. <br />No structure or fill shall be permitted within the limits of the floodway of the St. <br />Sebastian River, South Prong except as provided by [section] 930.07(2)(a)3.a. <br />0) <br />