My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-013
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:18:14 PM
Creation date
2/3/2023 12:45:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/17/2023
Control Number
2023-013
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 19 for Annual Permit, 2023 Compliance Monitoring and Reporting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 9 <br />Source Performance Standards (NSPS) requirements. The results of the annual LFG <br />sulfur content test will be used in the EAOR calculations. In the event of a status change, <br />Geosyntec will advise SWDD of its implications. <br />• Semi -Annual Monitoring Report: Geosyntec will prepare and submit two semi-annual <br />monitoring reports to demonstrate compliance with the federal requirements of the Title <br />V permit. The reports will address the following permit conditions or compliance <br />requirements: <br />o Submittal of reports of any required monitoring at least every 6 months. All instances <br />of deviations from permit requirements must be clearly identified in such reports. <br />o Reporting, in accordance with requirements of subsection 62-210.700(6) and Rule 62- <br />4.130, F.A.C.., of deviations from permit requirements, including those attributable to <br />upset conditions defined in the permit. Reports shall include the probable cause of <br />such deviations, and any corrective actions or preventative measures taken. <br />o Reports shall be accompanied by a responsible official, pursuant to subsection 62- <br />213.420(4), F.A.C. <br />The reports will only address deviations from the Title V permit conditions. Landfill and <br />LFG operation and maintenance (O&M) data are not required to be reviewed and <br />submitted to FDEP per the Title V permit. <br />• Annual Title V Emissions Fee: The EAOR application used for reporting to FDEP will <br />automatically calculate the annual emission fee for the facility. Geosyntec will notify <br />SWDD of the fee amount and will submit the check for payment of the fee on behalf of <br />SWDD prior to the April 1 deadline. <br />• Annual LFG Sulfur Content Test: Geosyntec will collect three samples of LFG <br />annually to determine the sulfur content in accordance with ASTM Method D5504-12 or <br />D7493. The samples will be tested by a certified air testing laboratory. The laboratory <br />test results will be used to calculate sulfur emissions and a report prepared for submittal <br />to FDEP. The LFG sulfur content test and reporting will be completed no later than 31 <br />December 2023. <br />Phase 5 — Technical and Miscellaneous Permit Compliance Support and Reporting <br />Under this phase, Geosyntec will provide SWDD with technical support and miscellaneous <br />permit compliance support services related to the Class I landfill and C&D disposal facility on an <br />as needed basis. These services may include: <br />NCP2022_222465/JL22076_2023 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.