Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 9 <br />Source Performance Standards (NSPS) requirements. The results of the annual LFG <br />sulfur content test will be used in the EAOR calculations. In the event of a status change, <br />Geosyntec will advise SWDD of its implications. <br />• Semi -Annual Monitoring Report: Geosyntec will prepare and submit two semi-annual <br />monitoring reports to demonstrate compliance with the federal requirements of the Title <br />V permit. The reports will address the following permit conditions or compliance <br />requirements: <br />o Submittal of reports of any required monitoring at least every 6 months. All instances <br />of deviations from permit requirements must be clearly identified in such reports. <br />o Reporting, in accordance with requirements of subsection 62-210.700(6) and Rule 62- <br />4.130, F.A.C.., of deviations from permit requirements, including those attributable to <br />upset conditions defined in the permit. Reports shall include the probable cause of <br />such deviations, and any corrective actions or preventative measures taken. <br />o Reports shall be accompanied by a responsible official, pursuant to subsection 62- <br />213.420(4), F.A.C. <br />The reports will only address deviations from the Title V permit conditions. Landfill and <br />LFG operation and maintenance (O&M) data are not required to be reviewed and <br />submitted to FDEP per the Title V permit. <br />• Annual Title V Emissions Fee: The EAOR application used for reporting to FDEP will <br />automatically calculate the annual emission fee for the facility. Geosyntec will notify <br />SWDD of the fee amount and will submit the check for payment of the fee on behalf of <br />SWDD prior to the April 1 deadline. <br />• Annual LFG Sulfur Content Test: Geosyntec will collect three samples of LFG <br />annually to determine the sulfur content in accordance with ASTM Method D5504-12 or <br />D7493. The samples will be tested by a certified air testing laboratory. The laboratory <br />test results will be used to calculate sulfur emissions and a report prepared for submittal <br />to FDEP. The LFG sulfur content test and reporting will be completed no later than 31 <br />December 2023. <br />Phase 5 — Technical and Miscellaneous Permit Compliance Support and Reporting <br />Under this phase, Geosyntec will provide SWDD with technical support and miscellaneous <br />permit compliance support services related to the Class I landfill and C&D disposal facility on an <br />as needed basis. These services may include: <br />NCP2022_222465/JL22076_2023 Compliance Monitoring Proposal <br />