My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-013
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:18:14 PM
Creation date
2/3/2023 12:45:57 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 10 <br />• reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br />• assist SWDD in finalizing the draft SWPPP that was completed and submitted to SWDD <br />in January 2016; <br />• quarterly monitoring and reporting of the LFG monitoring wells located at the perimeter <br />of the site and also in enclosed structures; <br />• miscellaneous permit and compliance support services; <br />• assistance with preparing annual budgets for SWDD; <br />• preparing agenda items for and attending SWDD Board of County Commissioners <br />meetings upon request; <br />• quarterly methane readings as required by the Class I landfill permit; <br />• sampling and reporting for additional monitoring wells and surface water for the C&D <br />debris disposal facility depending on the results of the semi-annual and quarterly <br />sampling and analytical testing; and <br />• other services as needed. <br />As part of these services, Geosyntec proposes to assist SWDD with the evaluation and resolution <br />of issues pertaining to the exceedances in select analytes of the C&D debris disposal facility and <br />Class I landfill monitoring wells and surface sample sites should these issues arise. <br />Phase 6 — Storage Tank Monitoring Wells Installation, Sampling and Reporting <br />In accordance with Table 2 of the Order, Geosyntec will assist SWDD with the following: <br />• installation of four new groundwater monitoring wells by a Florida Licensed driller and <br />preparation of well construction report for submittal to FDEP; <br />• initial and three additional sampling events, performed weekly, of the four installed <br />groundwater monitoring wells, analytical testing by Eurofins under direct contract to <br />SWDD, and preparation of the background water quality report for submittal to FDEP; <br />• two quarterly sampling of the wells following the initial filling of the storage tank with <br />leachate from the Class I Landfill, analytical testing by Eurofins under direct contract to <br />SWDD, and preparation of the first semi-annual groundwater monitoring report for <br />submittal to FDEP: and <br />• two additional quarterly sampling of the wells, analytical testing by Eurofins under <br />direct contract to SWDD, and preparation of the first annual summary report for <br />submittal to FDEP. <br />NCP2022_222465/X22076_2023 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.