My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-013
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:18:14 PM
Creation date
2/3/2023 12:45:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/17/2023
Control Number
2023-013
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 19 for Annual Permit, 2023 Compliance Monitoring and Reporting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 10 <br />• reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br />• assist SWDD in finalizing the draft SWPPP that was completed and submitted to SWDD <br />in January 2016; <br />• quarterly monitoring and reporting of the LFG monitoring wells located at the perimeter <br />of the site and also in enclosed structures; <br />• miscellaneous permit and compliance support services; <br />• assistance with preparing annual budgets for SWDD; <br />• preparing agenda items for and attending SWDD Board of County Commissioners <br />meetings upon request; <br />• quarterly methane readings as required by the Class I landfill permit; <br />• sampling and reporting for additional monitoring wells and surface water for the C&D <br />debris disposal facility depending on the results of the semi-annual and quarterly <br />sampling and analytical testing; and <br />• other services as needed. <br />As part of these services, Geosyntec proposes to assist SWDD with the evaluation and resolution <br />of issues pertaining to the exceedances in select analytes of the C&D debris disposal facility and <br />Class I landfill monitoring wells and surface sample sites should these issues arise. <br />Phase 6 — Storage Tank Monitoring Wells Installation, Sampling and Reporting <br />In accordance with Table 2 of the Order, Geosyntec will assist SWDD with the following: <br />• installation of four new groundwater monitoring wells by a Florida Licensed driller and <br />preparation of well construction report for submittal to FDEP; <br />• initial and three additional sampling events, performed weekly, of the four installed <br />groundwater monitoring wells, analytical testing by Eurofins under direct contract to <br />SWDD, and preparation of the background water quality report for submittal to FDEP; <br />• two quarterly sampling of the wells following the initial filling of the storage tank with <br />leachate from the Class I Landfill, analytical testing by Eurofins under direct contract to <br />SWDD, and preparation of the first semi-annual groundwater monitoring report for <br />submittal to FDEP: and <br />• two additional quarterly sampling of the wells, analytical testing by Eurofins under <br />direct contract to SWDD, and preparation of the first annual summary report for <br />submittal to FDEP. <br />NCP2022_222465/X22076_2023 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.