Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 7 <br />It is estimated that data collection and sampling will take five (5) full days in January and four <br />(4) full days in July for the semi-annual monitoring and reporting for the Class I landfill and <br />C&D debris disposal facility. Geosyntec will deliver the samples to Eurofins laboratory for <br />analytical testing under SWDD's contract (i.e., Eurofins laboratory will directly invoice SWDD). <br />The laboratory analytical testing will be conducted by Eurofins testing laboratory. The samples <br />collected from the Class I landfill monitoring wells will be analyzed for the routine monitoring <br />parameters listed in paragraph 7 of the WQMP and in accordance with paragraph 62- <br />701.510(5)(c) & (7)(a), F.A.C. The samples collected from the C&D debris disposal facility <br />monitoring wells, with the exception of the quarterly assessment wells, will be analyzed for the <br />routine monitoring parameters listed in paragraph 8 of the WQMP and in accordance with 62- <br />701.739(8)(d), F.A.C. The samples from the surface water site (SW -2) will be analyzed for the <br />list of parameters listed in Section III.2 of the Class I Landfill WQMP, as required by paragraphs <br />62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will assist SWDD in coordinating the analytical <br />testing activities with Eurofins, notify FDEP prior to sampling as required by the WQMP, review <br />and evaluate the analytical test results, and prepare the semi-annual reports. <br />The results of water -quality sampling under the WQMP will be presented in a report supported <br />by attachments containing chain -of -custody sheets, field notes and observations, water sampling <br />logs, maps, analytical results, and any other applicable materials. The reports will include <br />groundwater completion report form and groundwater elevation contour map, both signed and <br />sealed by a Florida registered professional engineer. These reports will be submitted to SWDD <br />for review prior to submittal to FDEP. The reports (in Adobe format) and analytical data <br />Electronic Data Deliverable (EDD) will be submitted electronically to FDEP using the ADaPT <br />software in accordance with Section V.E of the WQMP. According to the WQMP, monitoring <br />test results must be submitted to FDEP within 60 days from completion of laboratory analyses. <br />Phase 3 — Quarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2023 (January, April, July, <br />and October) of six (6) groundwater wells (MW-2IS, MW -405, MW -49S, MW -505, MW -51S, <br />and MW -52S) and four (4) surface water sample sites (SW -LCI, SW-LC3, LC-SW4, and LC- <br />SW6) for the C&D debris disposal facility and at four (4) groundwater monitoring wells (MW - <br />14S, MW -53S, MW -54S, and MW -54I) and four (4) surface water samples (C5 -SWI, SW -MW - <br />14S, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) days to <br />NCP2022_222465/X22076_2023 Compliance Monitoring Proposal <br />