My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-013
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:18:14 PM
Creation date
2/3/2023 12:45:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/17/2023
Control Number
2023-013
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 19 for Annual Permit, 2023 Compliance Monitoring and Reporting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 7 <br />It is estimated that data collection and sampling will take five (5) full days in January and four <br />(4) full days in July for the semi-annual monitoring and reporting for the Class I landfill and <br />C&D debris disposal facility. Geosyntec will deliver the samples to Eurofins laboratory for <br />analytical testing under SWDD's contract (i.e., Eurofins laboratory will directly invoice SWDD). <br />The laboratory analytical testing will be conducted by Eurofins testing laboratory. The samples <br />collected from the Class I landfill monitoring wells will be analyzed for the routine monitoring <br />parameters listed in paragraph 7 of the WQMP and in accordance with paragraph 62- <br />701.510(5)(c) & (7)(a), F.A.C. The samples collected from the C&D debris disposal facility <br />monitoring wells, with the exception of the quarterly assessment wells, will be analyzed for the <br />routine monitoring parameters listed in paragraph 8 of the WQMP and in accordance with 62- <br />701.739(8)(d), F.A.C. The samples from the surface water site (SW -2) will be analyzed for the <br />list of parameters listed in Section III.2 of the Class I Landfill WQMP, as required by paragraphs <br />62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will assist SWDD in coordinating the analytical <br />testing activities with Eurofins, notify FDEP prior to sampling as required by the WQMP, review <br />and evaluate the analytical test results, and prepare the semi-annual reports. <br />The results of water -quality sampling under the WQMP will be presented in a report supported <br />by attachments containing chain -of -custody sheets, field notes and observations, water sampling <br />logs, maps, analytical results, and any other applicable materials. The reports will include <br />groundwater completion report form and groundwater elevation contour map, both signed and <br />sealed by a Florida registered professional engineer. These reports will be submitted to SWDD <br />for review prior to submittal to FDEP. The reports (in Adobe format) and analytical data <br />Electronic Data Deliverable (EDD) will be submitted electronically to FDEP using the ADaPT <br />software in accordance with Section V.E of the WQMP. According to the WQMP, monitoring <br />test results must be submitted to FDEP within 60 days from completion of laboratory analyses. <br />Phase 3 — Quarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2023 (January, April, July, <br />and October) of six (6) groundwater wells (MW-2IS, MW -405, MW -49S, MW -505, MW -51S, <br />and MW -52S) and four (4) surface water sample sites (SW -LCI, SW-LC3, LC-SW4, and LC- <br />SW6) for the C&D debris disposal facility and at four (4) groundwater monitoring wells (MW - <br />14S, MW -53S, MW -54S, and MW -54I) and four (4) surface water samples (C5 -SWI, SW -MW - <br />14S, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) days to <br />NCP2022_222465/X22076_2023 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.