My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-013
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:18:14 PM
Creation date
2/3/2023 12:45:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/17/2023
Control Number
2023-013
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 19 for Annual Permit, 2023 Compliance Monitoring and Reporting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 6 <br />PROPOSED SCOPE OF SERVICES <br />The proposed scope of services includes activities to be performed on behalf of SWDD for the <br />compliance monitoring reporting and other technical support services for the Class I landfill and <br />C&D debris disposal facility. For the purpose of budgeting, the scope of work has been divided <br />into the following six (7) main phases: <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Semi -Annual Sampling and Reporting; <br />• Phase 3 — Quarterly Assessment Monitoring and Reporting; <br />• Phase 4 — Title V Permit Compliance and Reporting; and <br />• Phase 5 — Technical and Miscellaneous Permit Compliance Support and Reporting; and <br />• Phase 6 — Storage Tank Groundwater Monitoring Well Installation, Sampling and <br />Reporting. <br />The above scope of services is based on current regulations and reporting requirements for the <br />IRCL facility as previously discussed above. An amendment to this scope of services may be <br />needed should there be any regulatory changes that result in additional work. The remainder of <br />this section presents a general description of the activities to be performed in each phase. <br />Phase 1— General Consulting/Meeting Support/Project Management <br />Under this phase, Geosyntec will perform project planning and management responsibilities, <br />such as correspondence with SWDD and FDEP, invoice review, project coordination, and <br />project administration. Geosyntec has also included budget for preparation and attendance (by <br />two Geosyntec personnel) at one meeting with SWDD and/or FDEP, as needed. <br />Phase 2 — Semi -Annual Sampling and Reporting <br />Geosyntec will assist SWDD to perform the semi-annual sampling and prepare the water -quality <br />monitoring reports as required by the WQMP. Geosyntec will assist SWDD with conducting all <br />field sampling preparation activities, including scheduling, staffing, subcontracting, and field <br />equipment preparation. Prior to collecting the groundwater samples in January and July 2023, <br />Geosyntec will perform water -level measurements from the 56 groundwater monitoring wells <br />and 1 staff gauge (SG -12). Geosyntec will then perform semi-annual sampling of the Class I <br />landfill and C&D debris disposal facility groundwater monitoring wells in January (34 wells) <br />and July (25 wells) of 2023. We will also perform semi-annual (January and July) sampling of <br />the surface water site (SW -2), if its discharging from the stormwater pond. <br />NCP2022_222465/JL22076_2023 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.