Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />5 January 2023 <br />Page 6 <br />PROPOSED SCOPE OF SERVICES <br />The proposed scope of services includes activities to be performed on behalf of SWDD for the <br />compliance monitoring reporting and other technical support services for the Class I landfill and <br />C&D debris disposal facility. For the purpose of budgeting, the scope of work has been divided <br />into the following six (7) main phases: <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Semi -Annual Sampling and Reporting; <br />• Phase 3 — Quarterly Assessment Monitoring and Reporting; <br />• Phase 4 — Title V Permit Compliance and Reporting; and <br />• Phase 5 — Technical and Miscellaneous Permit Compliance Support and Reporting; and <br />• Phase 6 — Storage Tank Groundwater Monitoring Well Installation, Sampling and <br />Reporting. <br />The above scope of services is based on current regulations and reporting requirements for the <br />IRCL facility as previously discussed above. An amendment to this scope of services may be <br />needed should there be any regulatory changes that result in additional work. The remainder of <br />this section presents a general description of the activities to be performed in each phase. <br />Phase 1— General Consulting/Meeting Support/Project Management <br />Under this phase, Geosyntec will perform project planning and management responsibilities, <br />such as correspondence with SWDD and FDEP, invoice review, project coordination, and <br />project administration. Geosyntec has also included budget for preparation and attendance (by <br />two Geosyntec personnel) at one meeting with SWDD and/or FDEP, as needed. <br />Phase 2 — Semi -Annual Sampling and Reporting <br />Geosyntec will assist SWDD to perform the semi-annual sampling and prepare the water -quality <br />monitoring reports as required by the WQMP. Geosyntec will assist SWDD with conducting all <br />field sampling preparation activities, including scheduling, staffing, subcontracting, and field <br />equipment preparation. Prior to collecting the groundwater samples in January and July 2023, <br />Geosyntec will perform water -level measurements from the 56 groundwater monitoring wells <br />and 1 staff gauge (SG -12). Geosyntec will then perform semi-annual sampling of the Class I <br />landfill and C&D debris disposal facility groundwater monitoring wells in January (34 wells) <br />and July (25 wells) of 2023. We will also perform semi-annual (January and July) sampling of <br />the surface water site (SW -2), if its discharging from the stormwater pond. <br />NCP2022_222465/JL22076_2023 Compliance Monitoring Proposal <br />