My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-014
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2023 1:23:34 PM
Creation date
2/3/2023 12:53:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/17/2023
Control Number
2023-014
Agenda Item Number
15.B.5.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order No. 44 Amendment No.3 for Landfill Gas Flare Skid Improvements
and Pipeline Extension Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO.3 <br />WORK ORDER NUMBER 44 <br />LANDFILL GAS FLARE SKID IMPROVEMENTS AND PIPELINE EXTENSION <br />EXHIBIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (County) solid waste disposal district (S)WDD) currently relies on a <br />candlestick flare for landfill gas (LFG) emissions. The current blower flare skid was <br />installed in 2004 and is in need of updating and reconfiguration for overall performance <br />and efficiency, and to accommodate the renewable natural gas (RNG) project that is in <br />development with the Indian River Eco District (IRED). In addition, SWDD is working <br />with a third -party to install a leachate evaporation system that may utilize landfill gas as a <br />fuel source. To accommodate the RNG and evaporation projects, modifications to the LFG <br />skid and an extension to the LFG pipeline are required. The proposed modifications will <br />improve the LFG collection and control system by providing reliable vacuum pressure to <br />the gas wellfield and ensure continuous delivery of dry, pressurized LFG to the evaporation <br />and RNG projects. <br />Kimley-Horn and Associates, Inc. (Consultant) has partnered with BioGas Engineering <br />(BioGas) to design, permit and bid the proposed improvements. Amendment No. 3 <br />provides for additional design of the control panel required for the instrumentation to be <br />installed in the storage tank, proposed flow meters (3) and mixer. This amendment also <br />includes construction services during the construction phase of the project to complete the <br />installation of the landfill gas and leachate pipelines, communications conduit and <br />southeast swale (shop drawing reviews, site visits, etc.). <br />SCOPE OF SERVICES <br />Task 1: Landfill Gas Pipeline Design <br />Subtask 1.1.3 has been amended as noted below. <br />Subtask 1.1 Preliminary Design Activities <br />1.1.1 Alignment for Survey Purposes <br />No changes. <br />1. 1.2 Survey <br />No changes. <br />1.1.3 Geotechnical Data <br />No changes. <br />Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.