My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-014
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2023 1:23:34 PM
Creation date
2/3/2023 12:53:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/17/2023
Control Number
2023-014
Agenda Item Number
15.B.5.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order No. 44 Amendment No.3 for Landfill Gas Flare Skid Improvements
and Pipeline Extension Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 1.2 Landfill Gas Pipeline Design <br />1.2.1 30 Percent Design <br />No changes. <br />1.2.2 60 Percent Design <br />No changes. <br />1.2.3 90 Percent Design and Final Bid Package <br />No changes. <br />1.2.4 Bidding and Project Management <br />No changes. <br />Subtask 1.3 Coordination with Heartland <br />No changes. <br />Task 2: Landfill Gas Skid Design <br />Subtasks 2.3, 2.4 and 2.5 have been modified to accommodate minor changes to the scope <br />of the project. <br />Subtask 2.1 Request for Information <br />No changes. <br />Subtask 2.2 30 Percent Design <br />No changes. <br />Subtask 2.3 60 Percent Design <br />No changes. <br />Subtask 2.4 90 Percent Design and Final Bid Package <br />No changes. <br />Subtask 2.5 Bidding and Project Management <br />No changes. <br />Subtask 2.6 Permitting <br />No changes. <br />Task 3: SCADA Coordination and Electrical Considerations <br />The previous scope for this task included coordination with the various design teams on <br />the overall needs of a SCADA system. Since that time, SWDD engaged the County's <br />consulting integrator to develop the control system to operate the various project <br />components. This task is to be amended to include the physical design of the power feed <br />and the panel layout for the control panel that will house the input/output signals for two <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.