Laserfiche WebLink
Subtask 1.2 Landfill Gas Pipeline Design <br />1.2.1 30 Percent Design <br />No changes. <br />1.2.2 60 Percent Design <br />No changes. <br />1.2.3 90 Percent Design and Final Bid Package <br />No changes. <br />1.2.4 Bidding and Project Management <br />No changes. <br />Subtask 1.3 Coordination with Heartland <br />No changes. <br />Task 2: Landfill Gas Skid Design <br />Subtasks 2.3, 2.4 and 2.5 have been modified to accommodate minor changes to the scope <br />of the project. <br />Subtask 2.1 Request for Information <br />No changes. <br />Subtask 2.2 30 Percent Design <br />No changes. <br />Subtask 2.3 60 Percent Design <br />No changes. <br />Subtask 2.4 90 Percent Design and Final Bid Package <br />No changes. <br />Subtask 2.5 Bidding and Project Management <br />No changes. <br />Subtask 2.6 Permitting <br />No changes. <br />Task 3: SCADA Coordination and Electrical Considerations <br />The previous scope for this task included coordination with the various design teams on <br />the overall needs of a SCADA system. Since that time, SWDD engaged the County's <br />consulting integrator to develop the control system to operate the various project <br />components. This task is to be amended to include the physical design of the power feed <br />and the panel layout for the control panel that will house the input/output signals for two <br />Page 2 of 7 <br />