Laserfiche WebLink
At <br />APTIM <br />January 19, 2023 <br />Eric Charest <br />Natural Resources Manager <br />Indian River County Public Works Coastal Division <br />1801 27th Street, Vero Beach, FL 32960 <br />Subject: Indian River County, FL <br />Sector 5 — 2018029 — Work Order #11 <br />Year 3 Post -Construction Environmental Monitoring <br />Dear Eric: <br />Aptim Environmental & Infrastructure, LLC <br />6401 Congress Avenue, Suite 140 <br />Boca Raton, FL 33487 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, LLC (APTIM), to provide <br />professional services to Indian River County (the County) in support of the Sector 5 Beach and Dune Restoration <br />Project. The scope of work described herein is to support the County with the following: <br />1. To conduct the Year 3 Post -Construction Nearshore Hardbottom Biological Monitoring <br />The tasks to perform this work are listed below and described on the following pages. A breakdown of the hours <br />and expenses to develop the cost is attached. The scope and fee were developed following the provisions of the <br />Professional Services Agreement between Indian River County and APTIM, dated April 3, 2018, to provide <br />engineering and biological support services in support of the Sector 5 Beach and Dune Restoration Project <br />(RFQ#2018029). <br />Task 1: Year 3 Post -Construction Nearshore Hardbottom Biological Monitoring <br />The Sector 5 Year 3 Post -Construction nearshore hardbottom biological monitoring will be managed and <br />conducted by APTIM with the assistance of APTIM's approved subconsultant, Coastal Protection Engineering LLC <br />(CPE). APTIM and CPE will meet with the County on a weekly basis to provide a status report of the monitoring. <br />The Biological Monitoring Plan developed for the Sector 5 project during permitting requires post -construction <br />biological monitoring of the hardbottom resources adjacent to the project area to monitor for potential secondary <br />impacts. The scope for this task is based on the FDEP-approved Biological Monitoring Plan (FDEP Permit No. <br />0363427 -001 -JC and Mod. No. 0363427 -002 -JC). The post -construction nearshore hardbottom monitoring shall <br />include: <br />1) Hardbottom edge mapping <br />2) Monitoring permanent transects <br />Task 1: Scope of Work <br />1) Hardbottom Edge Mapping: <br />APTIM shall map the position of the nearshore hardbottom edge for the entire Sector 5 project area, including <br />