My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/2022
CBCC
>
Meetings
>
2020's
>
2022
>
12/06/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 11:37:48 AM
Creation date
2/14/2023 11:11:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/06/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />PROJECT: South Oslo Road WTP Improvements No. 2 <br />DATE OF ISSUANCE: November 30, 2022 EFFECTIVE DATE: <br />OWNER: Indian River County <br />OWNER's Contract No.: 2021026 Project No.: 044572102 <br />CONTRACTOR: TLC Diversified, Inc ENGINEER: Kimley-Horn & Associates, Inc. <br />You are directed to make the following changes in the Contract Documents: <br />Description: This change order instructs the Contractor to furnish/install the following for the lump sum of <br />$150,020.17: <br />1. 14" and 30" line stops on existing high service pump suction line. Replacement of three (3) <br />existing 14" gate valves on the high service pump suction line that do not hold. <br />2. Emergency repair of the leak in the existing 18" transfer piping. <br />3. Removal of buried concrete vault based on unforeseen conditions in the field. <br />Attachments: Quotations <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times: <br />$ 10,665,515.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Net changes from previous Change Orders <br />Net change from previous Change Orders: <br />No. 1 $483,563.83 <br />No. to No. <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ 11,149,079.48 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ 150,020.17 <br />0 <br />days <br />Contract Price with all approved Change <br />Contract Time with all approved Change <br />Orders <br />Orders <br />$ 11,299,099.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Days ora es <br />RECO E DED: APPROVED: <br />By:I�iIN1lE�rlotn� By: <br />Engineer (Authorized Signature) Owner (Authorized Signature) <br />Date: 11 `3o - Zp 2 2 Date: <br />ACCEPTED: <br />By: <br />Contractor (Authorized Signature) <br />Date: <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-24 152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.