My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/2022
CBCC
>
Meetings
>
2020's
>
2022
>
12/06/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 11:37:48 AM
Creation date
2/14/2023 11:11:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/06/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Central WWTFSludcge Tank Odor Control <br />Exhibit A. Scope of Work <br />ATKINs <br />• One (1) copy of a summary of the Consultant's responses to comments <br />provided during the 90% review meeting. <br />• Four (4) hard copies and one (1) electronic copy in PDF format of the signed <br />and sealed Construction Documents. <br />• One (1) copy of the updated Consultant's revised OPCC and Bid Form. <br />Task 05 Bidding Support Services <br />a. Pre-bid Meeting <br />Consultant will attend a pre-bid meeting scheduled by the County and present <br />technical information, project details and all information prudent to bidders. <br />b. RFI/Addendum <br />Consultant will consider written questions from bidders related to the Project and <br />prepare all addenda as required to interpret, clarify or expand the Contract <br />Documents. Submit maximum of two (2) addenda to County Project Manager in a <br />timely manner that allows reception of addenda by all bidders with the final <br />addendum to be provided no later than a minimum of five (5) days prior to bid <br />opening date. <br />c. Bid Recommendation <br />Then Consultant will review the Contractor's bid submittals and make a <br />recommendation to the County. <br />Deliverables <br />Task Deliverable <br />1 Project Management <br />2 Survey <br />3 Preliminary Design Report <br />4 Final Design <br />5 Bidding Support Services <br />Schedule <br />The anticipated schedule shown below is based on the weeks after the formal issuance of the <br />notice to proceed by County: <br />Task <br />Project Kick -Off Meeting <br />Begin Survey Activities <br />Data Collection and Review <br />Draft Preliminary Design Report <br />Duration from NTP <br />2 weeks <br />6 weeks <br />4 weeks <br />12 weeks <br />4 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.